10
2
BEFORE OPERATION
Inspections of the aerial work platform and the intended work area should be
performed daily before operation. Failure to inspect machine and work area
may result in death or personal injury.
Prior to Operation:
Conduct a pre-operation inspection of the aerial work platform by
performing all daily service checks as explained in this manual, as well
as all weekly and/or monthly service checks, if applicable.
Inspect the work area.
A comprehensive schedule of service checks and maintenance can be
found in the Parts and Service Manual. Annual service checks and
structural inspections should be performed only by personnel trained and
certified in accordance with applicable government regulations.
Содержание 45XA
Страница 1: ...OPERATOR S MANUAL 45XA AERIAL WORK PLATFORMS BOOMTM ...
Страница 10: ...BILJAX 45XA 8 NEVER jumpstart other vehicles using the boom lift batteries ...
Страница 17: ...2 BEFORE OPERATION 15 ...
Страница 31: ...3 OPERATION 29 ...
Страница 37: ...4 TROUBLESHOOTING 35 ...
Страница 43: ...5 DECAL PLACEMENT 41 ...
Страница 46: ...BILJAX 45XA RANGE OF MOTION Figure 7 1 Range of Motion 44 ...
Страница 50: ...BILJAX 45XA 48 ...
Страница 51: ...NOTES ...