background image

Содержание ORIANA A24656E

Страница 1: ...77 number on the Owners Manual Safety Instructions is for North America only INSTALLATION AND OPERATING INSTRUCTIONS To reduce the risk of serious injury or death you must read and follow these instru...

Страница 2: ......

Страница 3: ......

Страница 4: ......

Страница 5: ......

Страница 6: ...Square Assembly...

Страница 7: ...1 2 3641505 Box 1 F15 2 CE Access Board 1 x 6 x 19 3 4 F1 3630606 Box 1 3641554 Box 1 1 SW Ground 1 x 5 x 77 F16 3641694 Box 1 F17 2 End Floor 1 x 5 x 38 1 4 3641754 Box 1 F18 1 Lower Back Wall1 x 4...

Страница 8: ...99949 9pk Hole Plug 2 Rock Rail 2 x 3 x 51 3640349 Box 1 OR1 3 Ground Stake 1 1 4 x 1 1 2 x 14 3650318 Box 1 OR15 1X 3750702 Pineview Chalk Wall Green 1X 9750240 Wellington Canopy Large Green 2 Side R...

Страница 9: ...Lag Screw 1 4 x 3 1 4 Flat Washer LS1 9262212 4 Lag Screw 1 4 x 1 1 2 1 4 Flat Washer H2 22 Hex Bolt 1 4 x 2 9277220 1 4 Lock Washer 1 4 Flat Washer 1 4 T Nut H5 2 Hex Bolt 1 4 x 4 1 2 9277242 1 4 Lo...

Страница 10: ...__ 14459 ___ Box 1 CARTON I D STAMP __ __ __ __ __ 14459 ___ Box 2 CARTON I D STAMP __ __ __ __ __ 14459 ___ Box 3 CARTON I D STAMP __ __ __ __ __ 14459 ___ Box 4 CARTON I D STAMP __ __ __ __ __ 1445...

Страница 11: ...il as shown in fig 1 1 Make sure F1 CE Access Board is square and flush to the outside and bottom edges of each OR1 Attach using 4 S2 8 x 1 1 2 Wood Screws C 8 1 8 down from the top of both OR1 Rock R...

Страница 12: ...4 lock washer 1 4 flat washer 1 4 t nut 2 x 1 4 x 1 1 2 Lag Screw 1 4 flat washer Hardware Wood Parts H2 LS1 F13 A To 2 F13 Posts attach 1 F8 SL Ground with 4 H2 1 4 x 2 Hex Bolts with lock washer fla...

Страница 13: ...x Bolt 1 4 lock washer 1 4 flat washer 1 4 t nut 1 x 1 4 x 3 Lag Screw 1 4 flat washer 2 x 1 4 x 1 1 2 Lag Screw 1 4 flat washer H2 LS3 LS1 F13 LS1 B Make sure assembly is square and then fasten F17 E...

Страница 14: ...6 1 4 F9 F12 Hardware Wood Parts 2 x 1 4 x 4 3 4 Hex Bolt 1 4 lock washer 1 4 flat washer 1 4 t nut 2 x 1 4 x 3 Lag Screw 1 4 flat washer 2 x 12 x 2 Pan Screw with 3 16 flat washer H6 LS3 S7 F13 F13 A...

Страница 15: ...1 4 t nut 2 x 1 4 x 3 Lag Screw 1 4 flat washer H5 LS3 S7 OR9 Notice hole location towards bottom H3 A Attach OR9 Floor Back to OR8 Side Joist with 2 H3 1 4 x 2 1 2 Hex Bolts with flat washer lock was...

Страница 16: ...4 x 8x 3 Wood Screw S4 OR7 F17 F17 S4 A From inside of assembly measure 2 1 8 down from the tops of each F17 End Floor fig 6 2 6 3 then attach OR7 Floor Joist using 2 S4 8 x 3 Wood Screws per end fig...

Страница 17: ...Under floor boards F12 OR8 S2 Under floor boards A Install 1 F6 Cedar Gap Board tight to each end of the assembly attaching to OR8 Side Joist OR7 Floor Joist and F12 Front Floor using 5 S2 8 x 1 1 2 W...

Страница 18: ...g Wall side place 1 OR4 Floor Gusset tight to the bottom of the F6 Cedar Gap Board make sure assembly is square then attach to each F13 Post with 1 LS3 1 4 x 3 Lag Screw with flat washer per gusset in...

Страница 19: ...all Assembly from Step 1 on OR9 Floor Back flush to the edge and 1 2 down from the top as shown in 9 1 9 2 9 3 Attach OR1 Rock Rails to OR9 Floor Back using 4 S2 8 x 1 1 2 Wood Screws as shown in fig...

Страница 20: ...1 x CE Access Board 1 x 6 x 19 3 4 F1 S2 Hardware Wood Parts S2 OR1 Step 9 Attach Rock Wall to Fort cont C Attach F1 CE Access Board to top of Rock Wall Assembly flush to top of OR1 Rock Rails using...

Страница 21: ...osen bolts in F14 and F17 prior to attaching OR10 SW Mount G4 Step 10 Attach SW Mount and Side Roof A On the Swing Wall side of the assembly attach OR14 Side Roof to both F13 Posts with 2 H2 1 4 x 2 H...

Страница 22: ...r 1 4 flat washer 1 4 t nut PB1 Step 10 Attach SW Mount and Side Roof cont Fig 10 2 D On OR14 Side Roof and F17 End Floor in the holes next to OR10 SW Mount install 1 PB1 1 4 x 3 4 Pan Bolts with lock...

Страница 23: ...od Parts A In between both F13 Posts on Swing Wall side attach 7 F7 Wall Boards to F14 Wall Support and F17 End Floor with 4 S0 8 x 7 8 Truss Screws per board The first and last board should be tight...

Страница 24: ...r 1 4 flat washer 1 4 t nut H1 F10 PB2 S7 PB2 A Attach OR3 Back Divider to OR9 Floor Back with 1 H1 1 4 x 1 1 2 Hex Bolt with lock washer flat washer and t nut and to F10 Top Front Back using 1 PB2 1...

Страница 25: ...the bottom of F10 Top Front Back fig 13 1 13 2 B Place F5 Cedar Wall tight to the top of OR9 Floor Back and attach to F13 Post using 2 S2 8 x 1 1 2 Wood Screws fig 13 1 13 2 Fig 13 1 F5 S2 OR6 Lay fla...

Страница 26: ...Back Divider F Make sure F5 Cedar Wall is square and then attach to OR3 Back Divider from the inside of the assembly with 2 S1 8 x 1 1 8 Wood Screws fig 13 3 G From the outside of the assembly and 8 f...

Страница 27: ...ake sure F15 Front Top is square and then attach to both F13 Posts using 4 S7 12 x 2 Pan Screws with 3 16 flat washers fig 14 1 C Tighten all bolts Hex Bolt Assembly Lock Washer T Nut Flat Washer Hex...

Страница 28: ...nd working towards OR2 Front Divider attach 7 F7 Wall Boards to both F5 Cedar Walls using 4 S0 8 x 7 8 Truss Screws per board Make sure the bottom of the boards are tight against the floor boards and...

Страница 29: ...flat washer and t nut in each board and 2 PB1 1 4 x 3 4 Pan Bolt with lock washer flat washer and t nut in F17 End Floor Fig 16 1 H2 15 3 4 F14 H2 F13 F13 1 x Side Roof 1 x 4 x 68 1 x Wall Support 1 x...

Страница 30: ...boards are to be evenly spaced at 5 8 but not to exceed 1 gap All boards are to be tight against F6 Cedar Gap Board and bevelled edges are facing out and are at the top of the boards fig 16 2 Step 16...

Страница 31: ...of Ridge flush to outside edge of OR10 SW Mount and to OR13 Roof Support with 4 S3 8 x 2 1 2 Wood Screws as shown in fig 17 1 C Pre drill pilot holes for the screws using a 1 8 drill bit and then atta...

Страница 32: ...8 flat washer fig 18 1 18 2 C Make sure the tarp is taut and then secure opposite end of Canopy to OR12 Tarp Front Back on the opposite side of the assembly using 5 S5 8 x 1 2 Pan Screws with 8 flat w...

Страница 33: ...der as shown in fig 19 1 B Pre drill and attach slide to fort through F2 Cedar Floor Boards and into F12 Floor Front with 3 S7 12 x 2 Pan Screws fig 19 1 19 2 OR2 F13 F2 Centre slide in opening Hardwa...

Страница 34: ...L LOCATION FINAL LOCATION MUST BE LEVEL GROUND Warning To prevent tipping and avoid potential injury stakes must be driven 10 1 2 into ground Digging or driving stakes can be dangerous if you do not c...

Страница 35: ...W Mount as shown in fig 21 1 Use an extra Flat W asher If Bolt protrudes beyond T Nut Warning Check entire play centre for bolts protruding beyond T Nuts Use extra washers to eliminate this condition...

Страница 36: ...NOTES 36...

Страница 37: ...NOTES 37...

Страница 38: ...NOTES 38...

Страница 39: ...NOTES 39...

Страница 40: ...s product for ease of assembly Excellent Very Good Average Below Average Poor How would you rate our instructions Excellent Very Good Average Below Average Poor How would you rate the quality of packa...

Отзывы: