
Step 34: Attach Wiggle Wall to Fort
A:
Place Rock Wall Assembly from Step 6 against fort on the Swing Wall side between (C13) Post and (C15) Mid
Post making sure it is flush to the top of the floor boards. (fig. 34.1 & 34.2)
B:
Using the existing holes in (B20) Floor Front Back attach 2 WW Mount Straps to the (B20) Floor Front Back
and into (B29) Wiggle Joist with 1 (LS2) 1/4 x 2-1/2” Lag Screw (with flat washer) per strap in the second holes as
shown in fig. 34.2.
C:
Attach WW Mount Strap to each (B29) Wiggle Joist with 1 (LS1) 1/4 x 1-1/2” Lag Screw (with flat washer) in
the third hole per strap. (fig. 34.3)
D:
Attach each WW Mount Strap to (B20) Floor Front Back with 1 (S6) #12 x 1” Pan Screw in the top holes and to
(B29) Wiggle Joists with 1 (S7) #12 x 2” Pan Screw in the bottom hole. (fig. 34.3)
Pre-drill all pilot holes using a 1/8” drill bit before
installing the lag screws.
Predrill Pilot Holes for Lag Screw
Lag
Screw
Flat
Washer
Predrill 1/8”
pilot hole
Use factory drilled
hole as a guide
Hardware
2 x
#12 x 2” Pan Screw
2 x
#12 x 1” Pan Screw
2 x
1/4 x 1-1/2” Lag Screw (with 1/4” flat washer)
2 x
1/4 x 2-1/2” Lag Screw (with 1/4” flat washer)
S7
Fig. 34.1
B20
Under deck view
S7
Fig. 34.2
Fig. 34.3
Other Parts
LS2
WW Mount Strap
S7
LS1
LS1
S6
S6
S6
LS2
LS1
2 x WW Mount Strap
Use this
hole
Use this
hole
Under deck view
B29
B29
B29
B29
51
Содержание F23100
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 5: ......
Страница 6: ...Square Assembly...
Страница 71: ...NOTES 71...