
Step 33: Attach Swing Assembly to Fort
A:
Attach Swing Assembly from Step 10 to (C24) Wall Mount with 1 (G5) 5/16 x 4-1/2” Hex Bolt (with lock washer,
flat washer and t-nut) and 1 (GL8) 5/16 x 2” Hex Bolt (with 2 flat washers and 1 lock nut) as shown in fig. 33.1
B:
Drive 1 (A14) Ground Stake 10-1/2” into the ground at each (C27) SW Post on the inside of the assembly and
attach with 2 (S3) #8 x 2-1/2” Wood Screws per ground stake. (fig. 33.2 & 33.3)
Warning! To prevent tipping and avoid potential injury, stakes
must be driven 10-1/2” into ground. Digging or driving stakes
can be dangerous if you do not check first for underground
wiring, cables or gas lines.
Flat
Washer
Flat
Washer
Lock Nut
T-Nut
G5
GL8
2 x
Ground Stakes 1-1/4 x 1-1/2 x 14”
Hardware
Wood Parts
4 x
#8 x 2-1/2” Wood Screw
1 x
5/16 x 4-1/2” Hex Bolt
(5/16” lock washer, 5/16” flat washer, 5/16” t-nut)
1 x
5/16 x 2” Hex Bolt
(5/16” flat washer x 2, 5/16” lock nut)
S3
A14
Fig. 33.1
S3
Fig. 33.2
A14
Fig. 33.3
C27
Hex Bolt Assembly
Lock
Washer
T- Nut
Flat
Washer
He x
Bolt
C27
GL8
G5
Flat
Washer
Lock
Washer
C24
10-1/2” In
Ground
50
Содержание F23100
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 5: ......
Страница 6: ...Square Assembly...
Страница 71: ...NOTES 71...