
Step 21: Attach Floor Gap
A:
On the Slide Wall Side in between (C15) Mid Post and (C13) Post, both front and back side, attach 1 (C21)
Floor Gap to each (B20) Floor Front Back with 4 (S3) #8 x 2-1/2: Wood Screws per board. (fig. 21.1). Make sure
both (C21) Floor Gaps are flush to the top of the floor boards. (fig. 21.2)
Slide Side Wall
2 x
Floor Gap 2 x 3 x 39-5/8”
Hardware
Wood Parts
8 x
#8 x 2-1/2” Wood Screw
S3
C21
S3
Fig. 21.1
B20
Fig. 21.2
C21
Flush to Floor Boards
Floor Boards
B20
C21
C13
C15
C21
C15
C13
S3
Flush to Floor Boards
Flush to Floor Boards
35
Содержание F23100
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 5: ......
Страница 6: ...Square Assembly...
Страница 71: ...NOTES 71...