12
February 2022
Installation, Operation and Maintenance Manual
MAN 607 Rev. 6
Section 2: Installation
Installation
Ground
2.6
Electrical Connections (If Any)
NOTICE
Use components appropriate as for type, material and dimensions. The connections should
be made by qualified staff. Before carrying out any operation, cut line power off.
!
WARNING
Safety provisions:
2006/95/EC:
Directive for low voltage equipment (until 19 April 2016)
2014/35/EU from 20 April 2016
2004/108/EC:
Directive for the electromagnetic compatibility (until19 April 2016)
2014/30/EU from 20 April 2016
94/9/CE:
Directive and safety instructions for use in hazardous area
(until 19 April 2016) 2014/34/EU from 20 April 2016
Remove plastic plugs from cable entries.
•
Screw firmly the cable glands.
•
Introduce connection cables.
•
Make the connections in compliance with applicable wiring diagrams on the
documentation supplied.
•
Screw the cable gland.
•
Replace the plastic plugs of unused entries with metal plugs.
Figure 11
Junction box on control group (if foreseen)