
SECTION 2
INSTALLATION OF FIRE
2.1
UNPACKING THE COMPONENTS
Remove the loose item packaging carefully from the pack. Check the contents as
listed :-
DO NOT UNDER ANY CIRCUMSTANCES USE THIS APPLIANCE IF THE GLASS PANEL IS BROKEN
OR NOT SECURELY FIXED TO THE FIREBOX.
Packing Check List
Pack 1 of 3 - Combustion Chamber Pack
1 off
Combustion chamber & glass frame assembly
1 off
Boxed ceramic fuel-bed set (packed inside combustion chamber)
1 off
Installation / user instruction manual
1 off
Top closure plate
1 off
Loose items pack – containing :-
3 off AAA batteries, 1 off lighting kit,
1 off remote handset, 4 off M5 locknuts
3 off restrictor plates & fixing screws
1 off handset wall brkt (inc. fixings)
1 off glass removal tool,
4 off screws & rawlplugs
Pack 2 of 3 - Horizontal Balanced Flue System Pack
1 off
Adaptor
1 off
0.5m length of flue
1 off
90 degree elbow
1 off
Horizontal wall terminal
2 off
Locking bands
1 off
Protection band
or
Pack 2 of 3 - Chimney Conversion Kit
1 off
Adaptor
2 off
250mm length of flue
1 off
Renovation kit
1 off
Vertical terminal
2 off
Locking band
or
Pack 2 of 3 - Vertical Flue Kit
1 off
Adaptor
1 off Vertical terminal
In addition, all flue lengths, roof flashing, clamps and accessories as required by
the individual flue system design should be purchased as required from the
manufacturer, contact details as shown on page 12.
6