Installation Manual
October 2015: Rev 1.0
Step 2 - Setting out
Starting at the corner, place the 2.5m handrail tubes end to end in pairs along the length of the roof and starting
from the corner alternate a counter weight/upright and an un-weighted upright between each pair of handrail
tubes
Once the weighted uprights and the un-weighted uprights are in place connect a counterweight to the alternate
uprights.
Step 3 - Section assembly
Once the setting out is complete continue to assemble the first 2 bay section by connecting the second and
third pair of handrail tubes to the first and second uprights and fully tighten the screws.
Join these two weighted upright assemblies together using an un-weighted uprights. You now have a
completed two bay section. Repeat the above process until all the two bay sections are assembled.
Step 4 - Positioning.
Using at least two people positioned behind the assembly, carefully carry a two bay into position at the edge of
the roof.
The two bay sections should be positioned leaving a single bay between each one
.
INSTALLATION
Free Standing Edge Protection - System Configuration
Содержание Guard Angel
Страница 1: ...Installation Manual October 2015 Rev 1 0 Installation Manual October 2015 Revision 1 0...
Страница 5: ...Installation Manual October 2015 Rev 1 0 Free Standing System Installation...
Страница 10: ...Installation Manual October 2015 Rev 1 0 Profiled Roofing System Installation...
Страница 15: ...Installation Manual October 2015 Rev 1 0 Standing Seam Roofing System Installation...
Страница 20: ...Installation Manual October 2015 Rev 1 0 Concrete Structure Fixed System Installation...