Installation Manual

October 2015:  Rev 1.0

Step 5 - Final assembly

Using the remaining handrail piece - in between the two bay assemblies.

By placing one person either side of the opening behind the existing handrail assemblies, connect the
remaining handrail tubes into the top and bottom of the top riser sections on each upright fully tightening the
screws as you go.

INSTALLATION

Free Standing Edge Protection - System Configuration

Содержание Guard Angel

Страница 1: ...Installation Manual October 2015 Rev 1 0 Installation Manual October 2015 Revision 1 0...

Страница 2: ...n attachment point for fall protection PPE The equipment used should be stored in a safe manner and moved to the point of installation in line with the Manual Handling Regulations in the region of use...

Страница 3: ...Installation Manual October 2015 Rev 1 0 CONFIGURATION Edge Protection System Configuration TYPICAL LAYOUT INSITU DIMENSIONS...

Страница 4: ...015 Rev 1 0 TYPICAL CORNER DETAIL TYPICAL WALL TERMINATION DETAIL TYPICAL D END TERMINATION DETAIL TYPICAL END CAP TERMINATION DETAIL CONFIGURATION Edge Protection System Configuration Free Standing S...

Страница 5: ...Installation Manual October 2015 Rev 1 0 Free Standing System Installation...

Страница 6: ...om 2 x 54 mm pre galvanised steel to BS EN ISO 1461 with the upper and lower cross rails manufactured from 2 x 54mm external diameter pre galvanised steel The lower leg sections are manufactured from...

Страница 7: ...o handrail tubes down to form two tubes at 1200mm and two at 1300mm Take the one upright and connect a counter weight to it Insert one 1200mm tube into the top of the Top riser coupler and one 1300mm...

Страница 8: ...is complete continue to assemble the first 2 bay section by connecting the second and third pair of handrail tubes to the first and second uprights and fully tighten the screws Join these two weighted...

Страница 9: ...two bay assemblies By placing one person either side of the opening behind the existing handrail assemblies connect the remaining handrail tubes into the top and bottom of the top riser sections on ea...

Страница 10: ...Installation Manual October 2015 Rev 1 0 Profiled Roofing System Installation...

Страница 11: ...ons MATERIAL The main and intermediate uprights are fabricated from 2 x 54 mm pre galvanised steel to BS EN ISO 1461 with the upper and lower cross rails manufactured from 2 x 54mm external diameter p...

Страница 12: ...1200mm and two at 1300mm Take the one upright Insert one 1200mm tube into the top of the Top riser coupler and one 1300mm tube into the bottom of the top riser coupler fully tightening the screws as y...

Страница 13: ...rail tubes to the first and second uprights and fully tighten the screws Join these three upright assemblies together You now have a completed two bay section Repeat the above process until all the tw...

Страница 14: ...he two bay assemblies By placing one person either side of the opening behind the existing handrail assemblies connect the remaining handrail tubes into the top and bottom of the top riser sections on...

Страница 15: ...Installation Manual October 2015 Rev 1 0 Standing Seam Roofing System Installation...

Страница 16: ...tions MATERIAL The main and intermediate uprights are fabricated from 2 x 54 mm pre galvanised steel to BS EN ISO 1461 with the upper and lower cross rails manufactured from 2 x 54mm external diameter...

Страница 17: ...ubes at 1200mm and two at 1300mm Take the one upright Insert one 1200mm tube into the top of the Top riser coupler and one 1300mm tube into the bottom of the top riser coupler fully tightening the scr...

Страница 18: ...of handrail tubes to the first and second uprights and fully tighten the screws Join these three upright assemblies together You now have a completed two bay section Repeat the above process until al...

Страница 19: ...he two bay assemblies By placing one person either side of the opening behind the existing handrail assemblies connect the remaining handrail tubes into the top and bottom of the top riser sections on...

Страница 20: ...Installation Manual October 2015 Rev 1 0 Concrete Structure Fixed System Installation...

Страница 21: ...rent HSE regulations MATERIAL The main and intermediate uprights are fabricated from 2 x 54 mm pre galvanised steel to BS EN ISO 1461 with the upper and lower cross rails manufactured from 2 x 54mm ex...

Страница 22: ...ert one 1200mm tube into the top of the Top riser coupler and one 1300mm tube into the bottom of the top riser coupler fully tightening the screws as you do so Repeat the process for connecting the cu...

Страница 23: ...ully tighten the screws Join these three upright assemblies together You now have a completed two bay section Repeat the above process until all the two bay sections are assembled Step 4 Positioning U...

Страница 24: ...the two bay assemblies By placing one person either side of the opening behind the existing handrail assemblies connect the remaining handrail tubes into the top and bottom of the top riser sections o...

Страница 25: ...ths Visual inspection of the complete installation in accordance with the current needs of the client Check if any new equipment has been installed on the roof that may require further guardrail prote...

Страница 26: ...0 info bettersafeinternational com www bettersafeinternational com UK Riverside Mountbatten Way Congleton Cheshire CW12 1DY United Kingdom t 44 0 1260 217 437 NETHERLANDS Azewijnseweg 12 SF 4214 KC Vu...

Отзывы: