![BETTCHER INDUSTRIES AirShirz Скачать руководство пользователя страница 62](http://html.mh-extra.com/html/bettcher-industries/airshirz/airshirz_operating-instructions-and-spare-parts-list_2743095062.webp)
OPERATING
BETTCHER
AIRSHIRZ
®
INSTRUCTIONS
INDUSTRIES, INC. Rev. September 24, 2016
Page 56
9.4.8
Servo Linkage Installation (Continued)
Lay the servo link assembly over the power unit and orient the links so their holes are aligned with
their corresponding pins as shown in Figure #50. Push the links over the pins and post. Press
down on the linkage to be sure it is seated fully onto the finger loop post.
FIGURE #50
Push the power cylinder rod fully inward and hold the finger loop against the power cylinder to
allow access to the mounting hole.
Put the small washer onto the post screw then place them both into the mounting hole of the servo
link assembly as shown in Figure #50. Partially tighten the post screw leaving the linkage and
finger loop free to rotate.
Do Not Over Tighten
. (Due to the self-locking nature of this screw, a
certain resistance to turning is normal and required).
Wiggle the linkage gently to check for side play at the pins and the finger loop post. If any joints
have more than a few thousandths of an inch of side play, the linkage should be replaced.
Perform finger loop post screw adjustment procedure (see Section 9.2.1).