11
13. RECOvERY TANK
Make sure the recovery tank is empty, otherwise, empty it completely. Check
that it is properly secured to the handle tube and that the hoses are correctly
inserted in the tank elbows. Check the cap to ensure it is properly seated.
14. ASSEMBLING THE BRUSH
To install the brush - (Be sure squeegee is in the 'up' position)
1. Place the brush in front of the machine on the floor.
2. Raise the front of the machine using the handlebar as a lever.
3. Place the front of the machine over the brush, centering the hub into the
clutch plate on the brush.
4. Press the main switch button to power on the machine.
5. Pull the operation lever on the handle to engage the brush to the brush hub.
MACHINE PREPARATION
Содержание Genie B
Страница 19: ...19 ...
Страница 22: ...22 SQUEEGEE SYSTEM PARTS DIAGRAM 5 18 7 1 8 16 15 11 2 3 6 4 17 17 2 12 9 10 11 12 11 14 13 ...
Страница 24: ...24 SQUEEGEE YOKE PARTS DIAGRAM 13 2 5 1 10 7 3 11 14 8 6 12 4 9 ...
Страница 32: ...32 ELECTRIC SYSTEM PARTS DIAGRAM 4 7 2 1 6 3 5 ...
Страница 36: ...36 ACCESSORIES DIAGRAM 5 6 4 2 1 3 7 13 Pad 14 Pad Medium Brush STD General Brush Heavy Brush 8 Clutch Plate ...
Страница 38: ...38 ...
Страница 39: ...39 ...