10 bdl.
Roof Shingles
8
pcs.
Roof 'drip' Edge-10'
Step 21B
Install Doors continued
1.
Hang the other door. On this door, install a sliding
door latch, on the lower back of the door to secure
this door in place when closed. You will need to drill
a hole in the floor for the round shaft to drop into.
2.
Install a metal plate to the bottom of the right door.
The angle end will hold the bottom in-line with the
left door when closed.
3.
Install the door handles and locking door hasp on the
outside of the doors. When installed properly the hasp
will fold in half to receive locking latch and screw
heads will be covered.
Sliding Bolt on the
back of left door
4-1/2 sq.
Vinyl Siding
double 4" standard profile
4
ea.
Outside Corners
5
ea.
J-Channel
3
ea.
Under Sill Trim
4
ea.
Starter Strips
2
lb.
Nails
2
36" x 79" Wood Doors w/ Primed Siding
2
Boards w/ Alum. Track Attached
1
Treated Wood Threshold
1
Galvanized Door Sill
1
Door Trim
1x4
81-3/4"
2
Door Trim
1x4
80"
1
Door Jamb
3-7/8" x 72"
2
Door Jamb
3-7/8" x 79 - 5/8"
4
Track Rollers with Brackets
1
Swivel Door Latch
2
Door Handles
1
Sliding Latch
1
Flat Steel Bar Door Guide
2
3" x 5" Galv Flashing
4
1-1/4" Pan Head Screws for Door Sill
16
2-1/2" Wood Screws / square bit
Material List for Wood Pocket Doors
Material List for Vinyl Siding - Not Included
Required Shingles