background image

Tongue Edge

LAP Edge

Tool List

Hammer & Phillips Screwdriver
Framing Square & Level
Hand or Circular Saw

Power Drill/Screwdriver
Measuring Tape
2 - 8' Step Ladders

Always wear safety glasses when cutting or nailing!

The siding is made in 4x8 sheets with grooves
cut into the face, the long edge is beveled so
that the siding overlays where they butt.

To identify which edge we want you to use,
we will refer to the edge as either the 'LAP'
Edge or the Tongue Edge. Nail siding with
8d galvanized box nails spaced 8" apart.

I

MPORTANT

 I

NFORMATION

 A

BOUT

 Y

OUR

 S

HED

 K

IT

Thank you for purchasing our shed kit.  Read the instructions before starting the assembly of

the building.  If you have any questions about assembling the kit, call 800-245-1577. Business

hours (8:00-5:00 ET) Monday thru Friday.  After business hours call 724-866-HELP (4357) or
email to [email protected].

The material that is included in our kit is listed on the back page.  The optional floor package,
if purchased, will be supplied by a local lumber supplier.

Our kit does not include the shingles, the quantity needed is listed on the back page.  The siding
is primed.  You will need to apply a finish coat using latex acrylic paint.

Most buildings are installed on a wood floor and the siding was designed to extend over the
wood flooring.  If the foundation is a concrete floor cut the siding flush with the bottom of the
wall plate to prevent the concrete from contacting the siding.

The (2) two center boards on the shipping  pallet can be removed and used for wall bracing.

Stacking the boards, according to size, will make them easier to find when needed.  Some boards
may have colored ends.  Do Not discard any material until your building is complete.

Before you begin construction, be sure to study this assembly manual. Also, obtain a building

permit and check all pertinent building code regulations.

Thank you for your purchase.

Содержание Easton-R 12'x 20'

Страница 1: ...may not be copied in whole or in part without consent from Reynolds Building Systems Inc Copyright 2018 the Easton R 12 x 20 Revised November 21 2018 Assembly Book Best Barns USA Manufactured by Reyno...

Страница 2: ...help barnkits com The material that is included in our kit is listed on the back page The optional floor package if purchased will be supplied by a local lumber supplier Our kit does not include the s...

Страница 3: ...4x8 flooring over the 2x4s Use 8d galv spiral nails spaced 8 apart Material Description 12 x 20 2x4 Treated Blocking 2 pcs 8 2x4 PT Joist Headers 2 pcs 8 2x4 PT Joist Headers 2 pcs 12 2x4 PT Floor Jo...

Страница 4: ...nd the wall frame Step 1 Assemble 12 Side Wall Panel 1 Position 4 four 68 1 2 boards together and indicate with X marks where the wall studs will be located Mark the ends that will butt together with...

Страница 5: ...n the center of the wall frame 6 Repeat steps to assemble 1 one more wall frame The 2x4s are packed in the 4 extension kit 72 Wall Plate 72 Wall Stud Make 2 Two Frames OSB Filler 1 Gather 2 two 31 1 2...

Страница 6: ...hen the wall is square 4 Select one of the wall frames 5 Select a 24 wide panel with the tongue edge and install this panel with the cut edge flush with the end of the wall and extending 3 4 below the...

Страница 7: ...later Panel 1 72 Wall Plate 2 Square the wall frame Install a full width siding panel but do not nail along the long edge that overlaps the 10 wall frame You can nail this edge after the wall panels...

Страница 8: ...ed 2 Install 5 five 72 wall studs between the 80 1 4 wall plates 3 Locate 1 one 72 long 2x4 and cut to a length of 71 1 2 Install as a header support on the wall frame flush with bottom plate Use 10d...

Страница 9: ...Right Front Wall Frame Step 6 Apply Siding to Left Front Wall Frame 1 Select one of the wall frames from Step 5 Position frame with the header support on the right Install a siding panel with the LAP...

Страница 10: ...ding should extend 3 4 below the bottom plate Nail both siding panels to frame 1 Locate 2 two 34 3 4 long 2x4s and position them together Indicate with X marks where studs will be located Make 2 Two F...

Страница 11: ...blocks to the floor using 2 1 2 screws This will ensure that the gable frames and the trusses assembled next are identical 4 Secure the top of the truss rafters together with a 1 x4 barbed metal driv...

Страница 12: ...the 2x4 truss rafters at the top with a 8 x 20 wood gusset Apply wood glue between the 2x4s and the gusset Nail the gusset to the 2x4s with 14 fourteen 6d common nails 3 Install 2 two 12 x24 gussets a...

Страница 13: ...de wall panel and the Panel 1 from Step 4a IMPORTANT make sure walls are plumb and square Secure wall panels together at the corners Use 4 four 10d coated nails per corner 2 Install remaining 10 back...

Страница 14: ...im installed later will hide where the siding butts the end wall siding Step 12 Install Header Siding Cut 4 1 4 x 48 Siding Panels to Fit 7 Set the remaining the front right wall panel 8 Install 31 1...

Страница 15: ...each side of the door opening Tack these boards with a couple nails you may want to move the trim later when you install the doors Siding Extends Below Trim Trim Flush With Top Plate Step 14 Install...

Страница 16: ...cross the bottom plate The siding will extend 3 4 below the bottom 2x4 3 Install center and right panels Cut last panel flush with end of bottom plate LAP Edge Siding Extends 3 4 Below Bottom Plate 4...

Страница 17: ...ll Use 10d sinkers Cut to fit a 2x4 4 to finish 2 Repeat process to install 2x4 tie plates on the front wall Back Wall Panels Step 18 Layout Roof Trusses 1 Layout the truss spacing from the left sidew...

Страница 18: ...ks to the soffit panel using 2 two 1 1 2 long exterior screws 3 Install a 2x4 block at each end of the soffit flush with the 2x4 gable frame Step 20 Install Siding Filler Install small primed siding f...

Страница 19: ...oard flush with the face of the siding on the left gable Install the fascia so the bottom edge of the roof sheathing will rest on the edge of the 1x4 See Detail E Use a straight edge to align the 1x4...

Страница 20: ...w of roof sheathing will be about 1 below the ridge to allow for ventilation 2 Repeat on back of building 3 Install a 35 long 1x3 board over the singe door opening Position this board 3 4 above openin...

Страница 21: ...pposite side of 2x4 Locate the 28 wide door This door will be installed in the front door opening The instructions below describe installing a 2x4 as a door stiffener Decide which way the door will op...

Страница 22: ...u can move the trim in or out to make the door spacing equal 2 Determine position of hinges and install to side trim with 2 screws 3 Install a barrel bolt on the lower back of the left door to secure...

Страница 23: ...oof area If you are not installing shingles at this time you can purchase felt paper to protect the roof sheathing Install the felt paper before you install the metal roof edge Building Size Material...

Страница 24: ...athing 7 16 36 1 2 x 72 2 ea Sheathing 7 16 36 1 2 x 48 7 2x4 for Collar Ties 82 18 2x4 for Truss Rafters 80 1 2 4 2x4 for Wall Plates 80 1 4 51 2x4 for Wall Studs Plates 72 5 2x4 for Wall Plates 68 1...

Отзывы: