next shingle above this one. Place it so
that the shingle covers the black adhe-
sive surface. Repeat this step until you
reach the top. Repeat this process for
the remaining roof edges (ridges).
After all ridges are covered with shing-
les, attach the provided copper bonnet
to the roof top. Turn the bonnet until it
has the correct position at the top and
is set properly on the roof area. Now
attach it to the roof using several roo-
fi
ng nails. Make sure the screws do not
penetrate the roo
fi
ng board. (Consider
the length of the screws!)
Laying the roof felt:
Roof felt not include in the package;
available as accessory at your speci-
alist supplier.
Roll out the roof felt from one side to
the other beginning at the lower part
of the roof. Allow approx. 30-40 cm of
excess roof felt to the adjoining roof
areas and cut it off. Attach the roof felt
to the roof boarding with roo
fi
ng nails
or staples. Repeat this step for all roof
elements until you have laid one lay-
er around the entire roof. Lay the next
layers so that they overlap the underly-
ing sheet at the upper edge by approx.
30 cm. Lay them as described above.
Repeat this step until you reach the
top. Cut off a square piece of roof felt
for the top and attach it centred over
the top.
Contact your specialist supplier if you experience any problems during assembly.
7