Now take screw clamps and
fi
x the
fl
oor elements where they meet and
screw them together with the provided
screws (approx. 6-8 screws depending
on the model).
Attaching the base frame
Take the pressure impregnated base
frame and attach it to the
fl
oor at the
edge all the way around. The individu-
al pieces are numbered and should be
screwed to the
fl
oor at the correspon-
ding positions. See the drawing for the
amount of overhang. Screw the entire
frame and the inner parts to the
fl
oor
as described.
Turn over the completely assembled
fl
oor and set it in the proper place on
your foundation. At least two persons
are required to turn it over; you may
want to have a third person assist you.
We start with the door element. Carry
the door element to the position shown
in the drawing or where you want to
enter your pavilion and set it down on
the
fl
oor. Now take the element on the
left or right hand-side of the door and
place them at the position shown in the
drawing. The wall elements need to be
properly set on the foundation. Push
the two elements together on the frame
so that the sides (groove and tongue)
are properly connected. Screw the two
connected pieces together on the top
and bottom with a cordless screwdri-
ver. Make sure a second person holds
the wall elements from the outside
while screwing to prevent them from
falling over.
CAUTION:
Do not
fi
x them to the
fl
oor yet because
the elements still need to be moved.
The two screwed pieces should now
S
TEP
3
Setting up the wall elements
Contact your specialist supplier if you experience any problems during assembly.
3