6
WC-SUPPORT FRAME G3005A
Mounting the handle plate holder on the cistern for front actuation
Mounting the lever handle plate holder on the cistern for actuation from above
Flexible building protection
with service opening
Installation drawing - Top
Cistern cover
Top
Installation drawing - Front
Protection cover
Front
Fix the covers (Top and Front)
with the enclosed screws.
Flexible building protection
with service opening
Protection cover
Top
Protection cover
Front
Fix the covers (Top and Front)
with the enclosed screws.