14
A
PRIL
/25/2013
Installation Instructions
Installation Sequence:
Generally, there is no unique sequence for installation of the burner or heat exchanger. A review
of the job site will usually indicate a logical installation order. However, time and expense can be
saved if installation is begun at the most critical dimension, watching for interference from
overhead beams etc.
It is
RECOMMENDED
to follow the installation sequence shown in the following pages.
Standard FREE Hanging Installation
Step 1:
90.0
72.0
Angle iron
- Anchor angle irons at specified
distances to ceiling.
- Use turnbuckles or angle irons
to mount heater to anchored
angles as shown in manual.
Anchor this angle
iron as shown.
Note:
Burner side
Note:
Burner end / Vent side
S
ERIES
DECO-T
UBE