
1-9
Kenworth T600-T660-T800-W900
rev 10/7/13
Installation Procedures
Prepare the Work Area.
Start by
disconnecting the ground wire from the
starting batteries. Set up your work
light, clear the sleeper compartment of
loose items, and remove the divider
curtain if there is one. Then remove the
mattress.
Remove Aluminum Bunk Decking
Remove the screws securing the center
panel of the bunk deck (A) exposing the
center storage area (B).
Roll Floor Insulation Back.
Pull up
the floor insulation and roll it back out
of your way as shown.
1
3
A
B
Attention: The evaporator blower in the Phoenix will not rotate.
This unit will always be side discharge!
2
Содержание NITE Phoenix
Страница 21: ...Section 2 Electrical Installation Rev 9 25 2013 ...
Страница 39: ...2 18 Electrical Installation ...
Страница 42: ...Section 3 ESPAR Fuel Operated Heater Installation ...
Страница 53: ...Section 4 WEBASTO Fuel Operated Heater Installation ...
Страница 56: ...5 1 External Wiring Diagram Use for units manufactured after 2 08 2012 ...
Страница 57: ...5 2 Internal Wiring Diagram Use for units manufactured after 2 08 2012 ...
Страница 58: ...5 3 External Wiring Diagram Use for units manufactured prior to 2 08 2012 ...
Страница 59: ...5 4 Internal Wiring Diagram Use for units manufactured prior to 2 08 2012 ...
Страница 60: ...Section 6 Operating Instructions ...
Страница 64: ...Section 7 Battery Management System BMS Installation ...
Страница 65: ...7 1 Battery Management Bergstrom NITE System BMS 100 Installation ...
Страница 66: ...7 2 Battery Management ...
Страница 67: ...7 3 Battery Management ...