3-3
Heater Installation
Heater Unit Assembly –Attach
Mounting Plate.
Snap end cap on
heater unit (A). Place mounting plate
over heater unit (B). Attach with flat
lock washers and 10mm lock nuts—
tighten down securely.
Heater Unit Assembly – Attach
Gasket and Fuel Line Connection
Peel off backing from gasket and place
gasket over mounting plate edges,
sticky-side down. Place small black
rubber fuel line connector over the fuel
intake tube and push down. Place a
small clamp over connector, push to
bottom and tighten.
Heater Unit Assembly – Attach Fuel
Line
Now take the clear pick up tube, place a
small clamp over it, and push the tube
all the way to the bottom of the fuel
intake tube. Place clamp flush with top
of black connector and tighten securely.
5
6
7
B
A
Содержание NITE Phoenix
Страница 21: ...Section 2 Electrical Installation Rev 9 25 2013 ...
Страница 39: ...2 18 Electrical Installation ...
Страница 42: ...Section 3 ESPAR Fuel Operated Heater Installation ...
Страница 53: ...Section 4 WEBASTO Fuel Operated Heater Installation ...
Страница 56: ...5 1 External Wiring Diagram Use for units manufactured after 2 08 2012 ...
Страница 57: ...5 2 Internal Wiring Diagram Use for units manufactured after 2 08 2012 ...
Страница 58: ...5 3 External Wiring Diagram Use for units manufactured prior to 2 08 2012 ...
Страница 59: ...5 4 Internal Wiring Diagram Use for units manufactured prior to 2 08 2012 ...
Страница 60: ...Section 6 Operating Instructions ...
Страница 64: ...Section 7 Battery Management System BMS Installation ...
Страница 65: ...7 1 Battery Management Bergstrom NITE System BMS 100 Installation ...
Страница 66: ...7 2 Battery Management ...
Страница 67: ...7 3 Battery Management ...