2-2
Electrical Installation
3
5
4
Attaching Hold-down Brackets
Set two batteries side-by-side in the
battery box and place a hold-down
bracket on top, with the u-channel
facing up. Take two 5/16″ bolts, place
a 5/16″ flat washer on each, and then
put the bolts through the outer holes.
Tighten each bolt securely from under-
neath using the supplied nuts and
washers. Repeat the procedure for the
other two batteries.
Preparing Cables
The batteries are wired series/parallel
for 6 volt or parallel only for 12 volt.
See diagrams on pages 2-3 and 2-4
Make and Install All Cables
described
in steps 6a or 6b depending on which
batteries you are using.
NOTE: Before performing any wiring, Disconnect Truck Batteries.
Содержание NITE Phoenix
Страница 21: ...Section 2 Electrical Installation Rev 9 25 2013 ...
Страница 39: ...2 18 Electrical Installation ...
Страница 42: ...Section 3 ESPAR Fuel Operated Heater Installation ...
Страница 53: ...Section 4 WEBASTO Fuel Operated Heater Installation ...
Страница 56: ...5 1 External Wiring Diagram Use for units manufactured after 2 08 2012 ...
Страница 57: ...5 2 Internal Wiring Diagram Use for units manufactured after 2 08 2012 ...
Страница 58: ...5 3 External Wiring Diagram Use for units manufactured prior to 2 08 2012 ...
Страница 59: ...5 4 Internal Wiring Diagram Use for units manufactured prior to 2 08 2012 ...
Страница 60: ...Section 6 Operating Instructions ...
Страница 64: ...Section 7 Battery Management System BMS Installation ...
Страница 65: ...7 1 Battery Management Bergstrom NITE System BMS 100 Installation ...
Страница 66: ...7 2 Battery Management ...
Страница 67: ...7 3 Battery Management ...