
23
5 SHUT-DOWN
- Press the power switch on the control panel
(fig. 5.1)
- Turn the mains power switch OFF (fig. 5.2)
- Close the boiler’s fuel cock and water circuit
cock (fig. 5.3).
b
Empty the central heating system if
there is any risk of freezing. Contact
your local Technical Assistance
Centre if you encounter any problems
in completing the above procedure.
IMPORTANT!
Also perform the following steps.
- Remove the top panel from the casing
- Press the ignition knob on the gas valve
and turn it to clockwise to position (•) (fig.
5.4).
Fig. 5.1
Fig. 5.2
Fig. 5.3
Fig. 5.4
Содержание NOVELLA 55-64-71 RAP
Страница 1: ...Installation Manual NOVELLA 55 64 71 RAP Boilers Cast Iron Base EN Installation Manual...
Страница 26: ...26...
Страница 27: ......