Under  the  safety  valve,  install  a  water  collecting  funnel  with  the 

corresponding discharge in the event of leaks due to the overpressure 

of the heating system. The domestic hot water circuit does not need a 

safety valve, but make sure that the pressure of waterworks does not 

exceed 6 bar. In case of doubts, install a pressure reducer.

 

b

Prior  to  ignition,  make  sure  that  the  boiler  is  designed  to  operate 

with the gas available; this can be checked by the wording on the 

packaging and by the adhesive label indicating the gas type.

 

b

It is very important to highlight that in some cases the flues are under 

pressure, so the joints of the various elements must be airtight.

3.2  Installation regulations

The installation must be carried out by qualified personnel, in compliance 

with the following reference standards:

 -

UNI 7129-7131

 -

CEI 64-8.

Always  comply  with  local  standards  of  the  Fire  Department,  the  Gas 

Company and with possible municipal dispositions.

POSITION

EXCLUSIVE 

is a wall-hung boiler for heating and for the production of hot 

water. There are two categories, depending on the type of installation

:

 -

B23P-B53P boiler type - forced open installation, with flue gas discharge 

pipe  and  pick-up  of  combustion  air  from  the  installation  area.  If  the 

boiler is not installed outdoors, the air intake in the installation area is 

compulsory;

 -

C13, C13x type boiler;  C33, C33x; C43, C43x; C53,C53x; C63, C63x; 

C83,  C83x,  C93,  C93x:  appliance  with  airtight  chamber,  with  flue  gas 

discharge pipe and pick-up of combustion air from outside.

 

It does not require an air intake point in the installation area.

 

This type MUST be installed using concentric pipes, or other types of 

discharge designed for condensing boilers with an airtight chamber

.

The  boiler  can  be  installed  indoor  and  outdoor,  in  a  partially  protected 

place (fig. 6, i.e. a place where the boiler is not exposed to direct contact 

or infiltration of rain, snow or hail). The boiler can operate in a temperature 

range from -5°C to +60°C.

ANTI-FREEZE SYSTEM

The boiler is fitted as standard with an automatic anti-freeze system that 

actives when the water temperature in the primary circuit falls below 5°C. 

This  system  is  always  active,  guaranteeing  boiler  protection  down  to  an 

installation area temperature of -5°C. 

 

b

To take advantage of this protection, based on the burner 

operation, the boiler must be able to switch itself on; any 

lockout condition (i.e. due to a lack of gas or electrical supply, 

or the intervention of a safety device) therefore deactivates the 

protection.

Under normal operating conditions, the boiler can self-protect itself from frost.

In areas where temperatures may fall below 0°C, or when the machine is 

left unpowered for long periods, you are advised to use a good quality anti-

freeze liquid in the primary circuit to avoid the risk of freezing if you do not 

want to drain the heating system. 

Carefully follow the manufacturer’s instructions with regards not only the 

percentage of anti-freeze liquid to be used for the minimum temperature 

at which you want to keep the machine circuit, but also the duration and 

disposal of the liquid itself. For the hot domestic water part, we recommend 

you drain the circuit. The boiler component materials are resistant to ethylene 

glycol based anti-freeze liquids. Anti-freeze kits and upper cover kits are also 

available for boilers installed outdoors in a partially protected place.

MINIMUM DISTANCES (fig. 6a-6b)

To ensure access to the boiler for normal maintenance operations, respect 

the minimum installation clearances envisaged.

For correct appliance positioning, bear in mind that

:

 -

it must not be placed above a cooker or other cooking device

 -

it is forbidden to leave inflammable products in the room where the boiler 

is installed

 -

heat-sensitive walls (e.g. wooden walls) must be protected with proper 

insulation

.

 

b

In  case  of  installation  it  is  ESSENTIAL  to  provide  the  necessary 

space for the introduction of the instrument for the combustion 

analysis  check.  In  fig.  6b  is  shown  a  sample  drawing  where  the 

distances between boiler and cabinet/niche were obtained using a 

300mm length tool. Longer lengths of tools require more space.

3.3  Elimination of air from the heating circuit and 

from the boiler (fig. 7)

During  the  initial  installation  phase,  or  in  the  event  of  extraordinary 

maintenance,  you  are  advised  to  perform  the  following  sequence  of 

operations:

1.  Open by two or three turns the automatic relief valve cap (

A

) and 

leave 

it open.

2.  Open the system filling tap located outside the boiler.

3.  Switch on the electricity supply to the boiler, leaving the gas tap turned off.

4.  Activate a heat request via the room thermostat or the remote control 

panel, so that the 3-way valve goes into heating mode.

5.  Activate a request for hot water as follows: operate on the storage tank 

thermostat for 30” per minute so that the three-way valve cycles from 

heating to hot water and vice versa for about ten times (in this situation, 

the boiler will go into alarm due to lack of gas, therefore reset it whenever 

this is proposed).

6. 

Continue the sequence until no more air is felt coming from the air vent 

valve

7.  Check the system pressure level is correct (the ideal level is 1 bar). 

8.  Turn off the system filling tap.

9. 

Turn on the gas tap and ignite the boiler

.

3.4  Positioning the wall-mounted boiler and hydraulic 

connections (fig. 8-9-9a) 

The boiler comes as standard with a boiler support plate. The position and 

dimension of hydraulic fittings are shown in the detail drawing.

For the assembly, proceed as follows

:

 -

fasten  the  boiler  support  plate  (

F

)  to  the  wall  and  use  a  spirit  level  to 

make sure it is perfectly horizontal

 -

mark  the  4  holes  (ø  6  mm)  envisaged  for  securing  the  boiler  support 

plate (

F

)

 -

make sure that all measurements are exact, then drill the wall using drill 

tips with the diameters indicated above

 -

fix the plate with the built-in template to the wall

 -

fix the pipe supplied in the documentation envelope to the safety valve 

fitting, then connect it to an appropriate drain system

 -

carry out the hydraulic connections.

3.5  Electrical wiring (fig. 10-11)

Low voltage connections

Carry out the low voltage connections as follows

:

 -

use the external cable box supplied as standard

 -

unscrew the fixing screws of the cover (

V

)

 -

carry out the connections as shown in fig. 11

 

b

It is recommended to use wires with section not exceeding 

0,5mm

2

.

 

b

In case of TA or TBT connection, remove the respective shunts 

(fig. 12).

 -

close the box with the screws that were previously removed

 -

press  the  two  tabs  on  the  sides  of  the  box  to  place  it  correctly  in  its 

housing in the boiler sliding upward within the guide rails

 -

tighten the safety screw (

V1

).

 

b

If the low voltage electrical connection box is not connected the 

boiler does not ignite.

Remote control OTBus

In case the boiler is connected to a remote control OTBus, the boiler display 

shows “Open Therm Connected”. The boiler control functions are disable 

and the remote control OTBus become master for the main heating zone 

setting and the domestic hot water set point.

On the boiler display:

The boiler status mode selection is disable (the winter/summer/off mode is 

selectable only on the control OTBus).

The domestic hot water setting is disable (the domestic hot water set point 

is selectable only on the control OTBus).

On INFO menu

 it is visible the domestic hot water set point instead of 

domestic hot water flow rate.

The central heating set point on the boiler display is related only to a room 

thermostat request when there is not CH request from the control OTBus. 
Please note that in case of control OTBus connected, all the parameters 

type  request  and  type  activation  related  to  the  main  heating  zone,  are 

disable.

18/05/2013

12:17

MENU

INFO

SET

42

°C

1.5 bar

FRI

PLANT

HOT WATER TEMPERATURE

STATE

Open Therm connected

High voltage connections

The connection to the mains supply must be made via a separation device 

with an omnipolar opening of at least 3.5 mm (EN 60335/1 - category 3). 

The appliance works with alternating current at 230 Volt/50 Hz, and is in 

compliance with Standard EN 60335-1.

Содержание EXCLUSIVE R

Страница 1: ...EXCLUSIVE R Installer and user manual RO MANUAL DE INSTALARE SI UTILIZARE EN ES INSTALLER AND USER MANUAL MANUAL DE INSTALACI N Y USO...

Страница 2: ...o Warning This instructions manual contains data and information for both the user and the installer Specifically note that the user for the use of the appliance must refer to chapters Warnings and sa...

Страница 3: ...qualified personnel a a Any technical or cleaning operation is forbidden before disconnecting the appliance from the main power supply by turning the system s main switch to OFF and the main switch o...

Страница 4: ...ion of the instrument for the combustion analysis check In fig 6b is shown a sample drawing where the distances between boiler and cabinet niche were obtained using a 300mm length tool Longer lengths...

Страница 5: ...60 100 mm vertical 11 m 9 m 1 3 m 1 6 m Concentric pipe 80 125 mm 25 m 20 m 1 m 1 5 m Twin pipe 80 mm 70 70 m 35 35 m 1 m 1 5 m b b Straight length means with terminals and joints but without bends b...

Страница 6: ...ons open the caps of the lower A automatic air vent valve by two or three turns to allow a continuous venting of the air leave the plug of the valve A open make sure the cold water inlet tap is open o...

Страница 7: ...g disabling the key lock function is achieved by pressing the button A for more than 10 seconds During this step all of the LEDs C will flash for 1 second 3 11 6 Changing the operating mode In normal...

Страница 8: ...l as the outdoor temperature if available On the left and right sides are displayed the icons indicating the status of the system their meaning is as follows Pressing the keys up and down it is possib...

Страница 9: ...T 80 5 C AT 45 C BT INSTALLER CHANGE NAME INSTALLER PI PROPORTIONAL 5 0 99 SERVICE Only mixing zones with ACTUATION BE16 PI INTEGRAL 10 0 99 SERVICE Only mixing zones with ACTUATION BE16 VALVE RUN 120...

Страница 10: ...y if managed by the control board THERMOREGULATION INSTALLER CLIMATIC CURVES MAIN MAIN ZONE1 ZONE2 INSTALLER FIXED SET POINT 80 5 C AT 45 C BT MIN CH SET MAX CH SET INSTALLER If EXTERNAL PROBE NOT con...

Страница 11: ...NT 50 C 37 5 C 60 C INSTALLER Only if HEAT PUMP enabled to DHW TANK FROST PROTECT 7 C 0 C 100 C SERVICE Only if HEAT PUMP enabled to DHW TANK FR PROT OFFSET 5 C 1 C 20 C SERVICE Only if HEAT PUMP enab...

Страница 12: ...C INSTALLER MIN EMERG OUT T 10 C 20 C 10 C INSTALLER BOILER INTEGR DELAY 30min 1min 240min SERVICE HP INTEGR DELAY 30min 1min 240min SERVICE BOILER WAITING 2min 1min 60min SERVICE HEAT PUMP WAITING 2m...

Страница 13: ...orrectly that conditions for regular maintenance are guaranteed if the boiler is placed inside or between items of furniture the seal of the fuel adduction system that the fuel flow rate corresponds t...

Страница 14: ...ER OFF CH 3MIN RESET TIMERS CH This parameter allows you to reset the REDUCED HEATING MAXIMUM OUTPUT TIMING during which the speed of the fan is limited to 75 of the maximum heating output that has be...

Страница 15: ...ING NAME This parameter allows you to attribute a specific name to the heating zone POR This parameter allows you to enable the central heating programming timing for the zone concerned if the heat re...

Страница 16: ...depends on the type of heat request In any case the thermoregulation algorithm will not directly use the outdoor temperature but rather a calculated outdoor temperature that takes into account the bui...

Страница 17: ...16 C that can vary within the range 5 5 5 3 First commissioning Position the system s master switch to the on position Open the gas tap to allow fuel to flow Adjust the room thermostat to the desired...

Страница 18: ...ected When an outdoor temperature sensor is installed the outlet temperature is automatically selected by the system which quickly adjusts the ambient temperature according to the variations in the ou...

Страница 19: ...he up and down keys and confirm the selection to deactivate the function INSTALLER SCREED HEATING FUNZIONE GIORNALIERA DEACTIVATE FUNCTION ACTIVATE FUNCTION The screed heating function when active is...

Страница 20: ...from the cover of the instrument panel to access the electrical components AKM0x X17 X14 1 1 X12 X23 X16 X2 X21 X8 X13 X19 X9 X25 X11 X18 X22 1 1 1 1 1 1 1 1 6 1 5 12 10 4 3 5 4 6 5 6 X15 X1 X4 X6 1 3...

Страница 21: ...pplied with the settings indicated in the multigas table It is nevertheless possible according to the system requirements or the regional regulations on the combustion gas emission limits to set that...

Страница 22: ...k button it is possible to return to the main screen where a fault is signalled by this flashing icon 18 05 2013 12 17 MENU INFO SET 42 C 1 3 bar FRI PLANT HOT WATER TEMPERATURE STATE The user can ret...

Страница 23: ...0 5 sec on 0 5 off definitive E030 fan fault ON definitive E040 water transducer load the system ON definitive E041 water transducer load the system flashing 0 5 sec on 0 5 off transitional E042 water...

Страница 24: ...to OFF set the system s main switch to off close the fuel and water taps of the heating and domestic hot water system In this case the anti freeze and anti blocking systems are deactivated Drain the h...

Страница 25: ...REC10 MASTER and finish the operatione NEW to set a new system configuration restoring the factory setting of the parameters NEW FROM AKM SELECT THE TYPE OF CONFIGURATION ON OFF Closing position 5 20...

Страница 26: ...TI ZONE CONTROLLER REC10 V01 26 PRESS ANY KEY TO CONTINUE SELECT THE TYPE OF CONFIGURATION NEW FROM AKM 5 23 Replacing the AKM01 board The configuration operations should be carried out by professiona...

Страница 27: ...umption at maximum and minimum output checking the position of the ignition flame detection glowplug checking the gas failure safety device b b After carrying out the maintenance operations the analys...

Страница 28: ...ING function enabled If a heating request from the main zone is in progress the icon will be flashing This icon indicates that the circuit for domestic hot water production is enabled When a domestic...

Страница 29: ...ing ok to confirm the selection Pressing back takes you back to the initial screen without making any selection BOILER STATE MAIN ZONE 9 1 Boiler This function can be selected in order to set the boil...

Страница 30: ...n If the selection is cancelled or the back key is pressed you return to the previous SET screen SET THE PARAMETER WILL BE CHANGED CONFIRM CANCEL CONFIRM OR DELETE SELECTION 10 2 Domestic hot water on...

Страница 31: ...st the current time is replaced with the boiler flow temperature and turns on the icon concerning the type of request in progress A message for the system efficiency level can be displayed in the top...

Страница 32: ...D THURSDAY MODIFY DELETE COPY 07 30 11 30 18 00 END 08 30 13 30 22 30 SELECT OPTION Press the up and down keys to select the desired time band and press ok to confirm the selection START MAIN THURSDAY...

Страница 33: ...O MODIFY In order to confirm that the operation has been completed successfully the display will show the list of days to which the scheduled programme has been copied MAIN SCHEDULE OF THURSDAY WILL B...

Страница 34: ...h check the system flashing 0 5 sec on 0 5 off transitional boiler board communication lost ON transitional BUS 485 communication lost ON transitional List of combustion faults ERROR CODE ERROR MESSAG...

Страница 35: ...REC10 after which the machine must be disconnected from the power supply to reset the number of attempts available b b Request the intervention of the Technical Assistance Centre E020 LIMIT THERMOSTAT...

Страница 36: ...6 5 107 8 103 9 105 8 105 9 107 4 103 2 101 0 Useful efficiency Pn max 30 30 return 109 8 105 8 109 3 106 6 Efficiency at average P Range Rated 80 60 98 0 97 8 Efficiency at average P Range Rated 30 3...

Страница 37: ...20 G31 G20 G31 Maximum CO s a less than p p m 140 150 220 220 CO2 9 2 10 2 9 0 10 0 NOx s a lower than p p m 40 60 40 30 T flue gases C 63 64 65 70 Minimum CO s a less than p p m 10 15 20 40 CO2 9 1 1...

Страница 38: ...fan rotations rpm 1 500 1 900 Minimum number of DHW fan rotations rpm 1 500 1 900 b b DHW functions refer only if a storage tank is connected accessory available on request Parameter Symbol EXCLUSIVE...

Страница 39: ...ner 9 Conveyor 10 Fan 11 Mixer 12 Ignition transformer 13 Flue gas exhaust 14 Degassing unit pipe 15 Flue gas probe 16 Upper air vent valve 17 Limit thermostat 18 NTC delivery probe 19 Flame ignition...

Страница 40: ...bianco TBT OT SE TBT TA A B REC X11 X14 X25 M20 grigio grigio 1 10 viola viola rosso rosso nero alim blu sign marrone MOD 1 3 X19 T P 4 3 TBOL 1112 SBOL 6 1 X1 marrone blu 2 1 3 5 4 rosa blu P N L F 3...

Страница 41: ...at exchanger 13 NTC delivery probe 14 Limit thermostat 15 Upper air vent valve 16 Air water separator 17 Water tank available by request 3 16 15 A B 1 C D 11 12 13 10 7 6 5 3 2 4 14 8 9 E F TA Room th...

Страница 42: ...W pump modulation area graphic 1 setted to 7 metre circulator graphic 2 setted to 5 metre circulator graphic 3 0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 0 100 200 300 400 500 600 700 80...

Страница 43: ...43 EXCLUSIVE 5 A condensate drain B water gas 25R 35R C 275 350 A B C 6a 6b distances in mm measured in mm 6 Indoor installation Outdoor installation in a partially protected place...

Страница 44: ...sensor 13 14 OT Open therm 15 16 SBOL Water tank probe 17 18 X1 Not used 19 20 X2 Not used 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1718 19 20 A B TA TBOL TBT SE OT SBOL X1 X2 M20 D Voltage free contac...

Страница 45: ...IN PIPE 80mm 15 90 bend flange installed as standard A A C B COAXIAL PIPE 80 125mm flange installed as standard A A C B 90 bend flange installed as standard C B 90 bend A A adaptor flange installed as...

Страница 46: ...50 60 70 80 90 20 15 10 5 0 5 10 15 20 25 30 D A E CURVE DI TERMOREGOLAZIONE Temperatura esterna C Temperatura di mandata C 20 30 40 50 60 70 80 90 100 20 0 2 0 4 0 6 0 8 1 0 1 5 2 0 2 5 3 0 T80 T45 1...

Страница 47: ...25 130 135 140 145 150 155 160 165 170 175 Lunghezza tubo scarico fumi m Lunghezza tubo aspirazione aria m CaldaiaExclusive 25C n lunghezza massimatubi 80 mm EXCLUSIVE 25R flue gas pipe length m air s...

Страница 48: ...information contained in this manual at any time and without prior notice Consumers statutory rights are not affected Cod 20097753 04 15 Ed 0 Cod 20127998 07 17 Ed 2 RANGE RATED EN 483 The max CH inp...

Отзывы: