10
Installation
6005437_a – 30.05.2022
3.4.3
Install the ceiling mounting plate
The device is designed to be hung on ceilings.
When mounting to a solid ceiling:
☞
Make sure that the ceiling has sufficient load bearing
capacity.
☞
Ensure that the ceiling is level and horizontal.
☞
Use the fastening materials provided.
With different installation situations:
☞
Enquire about alternative fastening systems (e.g. consult
with your architect).
☞
Only use fastening hardware suitable for the type of
ceiling.
When hanging, first attach the ceiling mounting plate to
the ceiling and then screw the hood body onto the ceiling
mounting plate.
=
=
a
=
=
b
c
a Gap between two bolt anchors
375 mm
b Gap between two bolt anchors
267 mm
c Diameter of circle over slots
460 mm
☞
Determine the hanging position. Observe the hob
position:
y
The ceiling mounting plate’s centre point is directly
above the hob’s centre point.
y
The ceiling mounting plate runs parallel to the hob.
☞
Make sure that the legal safety clearances will be
complied with:
y
Recommendation 650 mm.
y
With electric hobs, at least 650 mm.
y
With gas hobs, at least 650 mm.
Observe the specifications for the cooking appliances
(e.g. installation above a solid fuel stove).
D
WARNING!
Risk of death due to explosions or electric shock!
Drilling through gas, water or electrical lines can lead to
hazardous situations.
☞
Ensure that there are no lines in the ceiling at the
fastening points.
Ø 8
65
☞
Determine the locations of the fastening points and mark
them:
y
2 bolt anchors inside the lock holes.
y
2 bolt anchors in the centre of slots.
☞
Drill the holes in the ceiling.
☞
Insert the bolt anchors into the holes.
☞
Ensure that the bolt anchors are tight in the holes.
Содержание Skyline Round BIH 60 SKR
Страница 26: ...26 6005437_a 30 05 2022 ...
Страница 27: ...27 6005437_a 30 05 2022 ...
Страница 28: ...6005437_a 30 05 2022 ...