11
Bentone
172 535 09-2
3. Installation
3.1
General instructions
Installation must be carried out in accordance with current regulations and
instructions.
The supplier/installer of the facility is obliged to familiarize himself with
all regulations so that the installation meets the requirements of the local
authorities.
Installation, assembly and settings must be performed to obtain the best
possible function. Only gas intended for the gas burner may be used.
3.2
Instructions
It is the installer’s responsibility to instruct the user in detail in the functions of
the gas burner and the entire system.
3.3
Inspection and maintenance
The system must be maintained at the interval specified in the service
schedule. If the burner is in a dirty environment, service should be done at
more frequent intervals.
3.4
Preparation for assembly
Check that the burner’s dimensions and capacity range match the current
boiler. The power information on the type plate refers to the burner model’s
min. and max. effect.
3.5
Gas supply
In order to obtain good operational safety, it is important that the installation
of the gas distribution system is carried out correctly, considering the
following:
•
Check that the burner is approved for the gas quality of the
installation.
•
Check that the burner gas components are approved for the specified
gas pressure, see type plate.
•
Installation must be carried out in accordance with current standards.
•
Pipe lines should be assembled so that service can easily be
performed on the boiler and burner.
•
Pipe lines should be assembled so that any contaminants do not come
into contact with the gas components.
3.6
Electric connection
•
Before work on the electrical connection, the current must be
disconnected so that the installation is isolated.
•
Connection must be done in accordance with the applicable
regulations.
•
Connection must conform to the wiring diagram.
!
If any electrical connection other than that recommended
by Enertech is used, there is a risk of property damage and
personal injury.
Содержание BG 300-2
Страница 26: ...26 Bentone 7 7 1 Pressure taps 1 2 3 4 5 1 8 screwed sealing plug 7 7 2 Electrical connection S 20 S 50...
Страница 42: ......
Страница 43: ......
Страница 44: ...Enertech AB P O Box 309 SE 341 26 Ljungby www bentone com...