• Before service, shut off the fuel supply and turn off the power to the
burner.
• Leak checks must be performed during installation and service to
prevent fuel leakage.
• Care should be taken by the installer to ensure that no electrical cables
or fuel lines are crushed or otherwise damaged during installation or
service.
• If the boiler is equipped with an access hatch, this must be equipped
with a hatch opening switch connected to the burner's safety system.
• When in operation, the burner’s noise level can exceed 85 dBA.
Use hearing protection.
• The burner must not be put into operation without proper safety and
protection devices.
• Fire extinguisher with Class BE recommended.
• Modifying the design or using accessories that have not been
approved by Enertech in writing is strictly prohibited.
• Prior to operation, the following points must be checked:
-
fi tting and installation work has been completed and approved
-
electrical installation has been correctly performed
-
fl ue gas ducts and combustion air ducts are not blocked
-
all actuators and control and safety devices are in working order and
correctly set
• After commissioning
-
If the gas burner control has a solid red light, contact your installer.
Содержание 650004465601
Страница 33: ...33 Bentone 165 305 28 8 Oil burner control 8 1 Wiring diagram B 55 B 65 2 step LMO24 FAME RME...
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ...Enertech AB P O Box 309 SE 341 26 Ljungby www bentone com...