
85
2-1. “Blue Edge” Trouble Shooting:
I.
Re-adjust “Overfill” first.
For Overfill Re-adjustment:
i.
Those 2 Adjustment Screws must be released for around 2 mm first.
ii.
Alignment Sequence:
c.
To adjust “Horizontal Adjustment Screw” firstly, then “Vertical Adjustment Screw”.
d.
Refer to Figure 2-1..
Fig. 2-1
II.
Re-assemble LP module—include LP, LP Baffle, LP clip.
(2) Overfill Vertical
Adjustment Screw
(1) Overfill Horizontal
Adjustment Screw
Содержание 9H.Y1277.000
Страница 17: ...17 Packing NOTE The updated Service BOM is on SPO system Please check it to order service parts...
Страница 18: ...18 CTN LBL PRINTING For BQA CTN LBL PRINTING For BQE...
Страница 19: ...19 CTN LBL PRINTING For BQP...
Страница 20: ...20 CTN LBL PRINTING For BQC...
Страница 21: ...21 SPEC LBL PRINTING 1 SPEC LBL PRINTING For BQE BQA BQP 2 SPEC LBL PRINTING For BQC...
Страница 22: ...22 LAMP LBL PRINTING For BQC...
Страница 31: ...31...
Страница 39: ...39 2 Overfill adjustment As the picture below adjust light pipe to keep overfill image center...
Страница 43: ...43 Level 2 Circuit Board and Standard Parts Replacement Product Exploded View Module 1 Total Exploded View...
Страница 44: ...44...
Страница 45: ...45 Module 2 ASSY UPPER CASE...
Страница 46: ...46 Module 3 ASSY LOWER CASE...
Страница 47: ...47 Module 4 ASSY FRONT CASE...
Страница 56: ...56 Fig 1 15 Fig 1 16 Fig 1 17 Fig 1 18 Clip Lamp Clip Up Lamp Breach is located on top of terminal...
Страница 63: ...63 Fig 6 4 Fig 6 5 Fig 6 6 Fig 6 7 Clip UP CM Sponge...
Страница 75: ...75 9 Bracket Power BD assemble concern 9 1 8F VG564 8R0 3 for BKT Power BD and Lower Case 8 3...
Страница 79: ...79 16 Twin Fan Wire arrange Please following the Fan Wire arrange such as below photo Wire Arrange Method...
Страница 86: ...86 Chapter 3 Power Trouble Shooting Guide...
Страница 87: ...87...
Страница 91: ...91...