5 - 75
Assemble:
after assembling the two half casings, tighten the screws Fig. Q
to the following torque:
T.R.
Position screws (40): (M6)
Position screws (41): (M8)
Position screws (42): (M10)
Rotate the complete casing through 180° and tighten the screws
Fig. R to the following torque:
Position screws (38): (M8)
Position screws (36): (M8)
Position screws (34): (M10)
Use Loctite while tightening
Strong Loctite
Casing closure tightness torque
Sequence
Size
Phases
1
M10:
1°Phase 12 N.m
2°Phase 24 N.m
3°Phase 45 N.m
2
M8:
1°Phase 12 N.m
2°Phase 30 N.m
3
M6:
1°Phase 10 N.m
2°Phase 12 N.m
40
40
40
42
41
41
41
40
40
40
40
40
Q
34
36
38
39
38
R
GEAR BOX
GEAR BOX ASSEMBLY
Install:
• washer
•
the counter shaft gear nut (6)
T.R.
Torque 90-100 N*m
Install:
• washer
•
drive shaft gear nut (2)
T.R.
Torque 115-125 N*m
NOTE:________________________________
To keep the two drive shafts still, it is necessary to use the
tool (**) in Fig. S
(**) Gear wrench
Code: 03200097053000
S
6
2
(**)
COPY - Moto GB - Grant Martland - [email protected]
Содержание TRK 502
Страница 6: ...1 1 1 COPY Moto GB Grant Martland grantmartland motogb co uk ...
Страница 19: ...2 2 1 COPY Moto GB Grant Martland grantmartland motogb co uk ...
Страница 37: ...3 1 3 COPY Moto GB Grant Martland grantmartland motogb co uk ...
Страница 40: ...3 4 NOTES COPY Moto GB Grant Martland grantmartland motogb co uk ...
Страница 95: ...4 1 4 COPY Moto GB Grant Martland grantmartland motogb co uk ...
Страница 254: ...5 1 5 COPY Moto GB Grant Martland grantmartland motogb co uk ...
Страница 345: ...6 1 6 COPY Moto GB Grant Martland grantmartland motogb co uk ...
Страница 360: ...ELE 16 7 COPY Moto GB Grant Martland grantmartland motogb co uk ...