17
2. From the Offside Column insert the non looped end
of the Safety Cable through the hole located to the right of
the Offside Safety Weldment. (See Fig 9.5)
3. Route the Cable over the Safety Cable Pulley and take
it down to the Base Plate Pulley. (See Fig 9.6)
4. Route the Safety Cable through the Base Plate Safety
Cable Pulley(s) and across the floor towards the Powerside
Column. (See Figs 9.7 & 9.8)
5. Route the Safety Cable up the Power Side Column
going towards the Power Side Safety Cable Pulley.
6. Route the Safety Cable over the Power Side Safety
Cable Pulley, through the hole in the Column and over
the top Pin on the Safety Handle. Insert the Cable end
through the hole on the threaded Pin. (See Fig 9.9)
7. Pull the slack out the Safety Cable and hold tension
as the Cable is being tightened. Tighten Jam Nuts on
either side of the Cable to secure it into place.
(See Fig 9.9)
Fig 9.6.
Fig 9.5
Fig 9.7.
Fig 9.8