21
NOTE:
The Equalizer Pulleys should be removed to
assist in the routing of the Equalizer Cables.
1. With the Carriages locked at 28” off the floor, route the
Equalizer cables as shown below and in Fig. 11.1.
2. Run the Button end of the Cable down though the top
of the Carriage and into the clip in the Carriage.
(See Fig. 11.2)
3. Route the Cable around the Top Plate Pulley and
back down towards the Carriage. (See Fig. 11.3)
4. Run the Threaded end through the Carriage around
the Base Plate Pulley across the floor to the opposite
Base Plate Pulley. (See Fig. 11.4)
5. Run the threaded Cable end up to the U-shaped Slot
in the Carriage.
6. Feed the threaded end up through the U-shaped slot
in the Carriage. Place Washer and Nylock Nut on the
Threaded end and tighten till the Cable is just taut.
(See Fig. 11.5)
7. Reinstall the Pulleys, Bottom Sheave Covers and Hair
Pins.
8. Repeat the procedure for the other Equalizer Cable.
DANGER !
MAKE SURE THAT THE SAFETY LOCKS ON
EACH COLUMN ARE FULLY ENGAGED BEFORE
ATTEMPTING TO ROUTE EQUALIZER CABLES
AND/OR HOSES. CARRIAGES MUST BE EQUAL
HEIGHT FROM THE FLOOR BEFORE PROCEEDING.
Fig. 11.2
Fig. 11.3
Fig. 11.5
Fig. 11.4