19
3. Route the Cables around the sheaves as they are rein-
stalled. Insert 3 sheaves and 2 spacers into the bottom part
of the Power Post Sheave Box and secure the sheaves with
the Upper Sheave Stack Pin. Then insert 1 sheave and 2
spacers into the upper part of the Sheave Box and slide it
towards the interior of the lift. Secure the top sheave with
the Single Sheave Pin. Install the supplied M10 bolt and
nylock nut to securely fasten the pin.
(See Fig 6.3)
NOTE: Failure to install FRICTION SPACERS will result in prema-
ture sheave wear and void warranty.
4. To install the horizontally oriented sheave in the Front
Post Sheave Box tilt it at an angle as it is slid in and rotate
it once it is inside the Sheave Box. Then insert 2 sheave
spacers and install the Single Sheave Pin vertically and bolt
in place. Insert the lower sheave through the back of the
Sheave Box with 2 spacers and secure with Single Sheave
Pin and hardware. (See Fig 6.4-6.5)
5. In the Front Closeout Post insert a sheave and 2 spac-
ers into the lower part of the Sheave Box from the side of
the Sheave Box and secure with a Single Sheave Pin and
bolt in place. (See Fig 6.6)
6. In the Rear Closeout Post insert a sheave and 2 spac-
ers into the upper part of the Sheave Box from the outside
of the Sheave Box and slide it towards the interior of the lift.
Secure with a Single Sheave Pin and bolt in place. (See Fig
6.7)
NOTE:
THE CABLES ARE NAMED IN ORDER FROM THE
SHORTEST (A) TO THE LONGEST (D).
Fig 6.2
Cable “A”
Cable “B”
Cable “D”
Cable “C”
Sheave “A”
Sheave “C”
Sheave “D”
Sheave “B”
Sheave Box
Bottom Plate
Upper
Sheave
Stack Pin
Single
Sheave Pin
M10 Nylock
Nut
M10 Bolt
Fig 6.4
Fig 6.5
Fig 6.3
Washer
and Nylock
Nut
Содержание PL-14000
Страница 25: ...25 ...
Страница 29: ...29 Not provided by BendPak 4450mm lg 2500mm lg 2200mm lg Multiple Unit Hydraulic Hose Routing ...
Страница 35: ...35 ...
Страница 36: ...36 ...
Страница 41: ...41 Grease Port Lubrication Locations Lubricate Once A Week ...
Страница 43: ...43 ...