Create Chalk Line Guides
Make sure to plan out, in advance, where the P-9000LT/F is going to go:
•
Clearance
. If you are installing the P-9000LT/F over a pit, you are restricted as to where you can
put it. Be sure to make sure there is adequate clearance on all sides.
•
Console
. The Console must be positioned near the Lift; the Hydraulic Hoses that come with the
P-9000LT/F are optimized for up to 30 inches between the Lift and the Console.
•
Operator
. The Operator at the Console
must
have a full, unobstructed view of the Lift.
•
Power
. The Console must also be positioned near an appropriate power source.
•
Hydraulic Cylinders on the inside
. The two Frames are
not
interchangeable. The Hydraulic
Cylinders must go on the inside (on the pit side if installing over a pit). The holes in the Platforms for
the optional Lift Arms must go on the outside.
•
Set up Chalk Line Guides
. Create Chalk Line Guides to make sure the Lift gets installed where
you want it to get installed.
To create Chalk Line Guides
:
1.
Decide where you want the Lift.
2.
Create an Alignment Chalk Line where you want one end of the P-9000LT/F.
Make the Alignment Chalk Line longer than the width of the P-9000LT/F and the Pit.
3.
Move the two Frames into position: the Hinged Ramp ends just inside the Alignment Chalk Line
and the inside edges of the Frames aligned with the Pit.
The two Frames are not interchangeable; the Hydraulic Cylinders on the Bases need to be on the
inside, closer to the Pit.
Tip
This procedure assumes you are installing the Lift over a pit. If not, create two
additional Chalk Line Guides: they need to be perpendicular to the Alignment Chalk
Line, parallel to each other, and the distance apart you want the two Platforms (in the
range of 36" to 42" / 914 mm to 1,066 mm).
Содержание P-9000LT
Страница 50: ...P 9000LT F Low Rise Pit Lift 50 P N 5900022 Rev B Nov 2019 Wiring Diagrams 5585020 5585015 ...
Страница 52: ...P 9000LT F Low Rise Pit Lift 52 P N 5900022 Rev B Nov 2019 Labels ...
Страница 53: ...P 9000LT F Low Rise Pit Lift 53 P N 5900022 Rev B Nov 2019 ...
Страница 54: ...P 9000LT F Low Rise Pit Lift 54 P N 5900022 Rev B Nov 2019 ...
Страница 55: ...P 9000LT F Low Rise Pit Lift 55 P N 5900022 Rev B Nov 2019 Parts Diagrams ...
Страница 56: ...P 9000LT F Low Rise Pit Lift 56 P N 5900022 Rev B Nov 2019 ...
Страница 57: ...P 9000LT F Low Rise Pit Lift 57 P N 5900022 Rev B Nov 2019 ...
Страница 58: ...P 9000LT F Low Rise Pit Lift 58 P N 5900022 Rev B Nov 2019 ...
Страница 59: ...P 9000LT F Low Rise Pit Lift 59 P N 5900022 Rev B Nov 2019 ...
Страница 60: ...P 9000LT F Low Rise Pit Lift 60 P N 5900022 Rev B Nov 2019 ...
Страница 61: ...P 9000LT F Low Rise Pit Lift 61 P N 5900022 Rev B Nov 2019 ...
Страница 62: ...P 9000LT F Low Rise Pit Lift 62 P N 5900022 Rev B Nov 2019 ...
Страница 63: ...P 9000LT F Low Rise Pit Lift 63 P N 5900022 Rev B Nov 2019 Maintenance Log ...
Страница 64: ...1645 Lemonwood Drive Santa Paula CA 93060 USA 2019 by BendPak Inc All rights reserved bendpak com ...