P-9000LT/F Low-Rise Pit Lift
38
P/N 5900022 — Rev. B — Nov. 2019
Adding Hydraulic Fluid
The Hydraulic Fluid reservoir on the Power Unit must be filled with Hydraulic Fluid or automatic
transmission fluid
before
you begin normal operation of the Lift.
When you receive the Lift, the
fluid reservoir is empty.
The Power Unit will not work correctly until the reservoir is filled with approved Hydraulic Fluid.
Approved fluids are any general purpose ISO-32, ISO-46, or ISO-68 Hydraulic Fluid, approved
automatic transmission fluids such as Dexron III, Dexron VI, Mercon V, Mercon LV, or any synthetic
multi-Vehicle automatic transmission fluid.
⚠
WARNING
Do not run your Power Unit without Hydraulic Fluid; you will damage it.
To fill the Hydraulic Fluid Reservoir:
1.
Remove the Reservoir Cap from the top of the Hydraulic Fluid Reservoir.
Not necessarily to scale. Not all components shown.
2.
If the Hydraulic Fluid Reservoir is
not
full, fill it with approved fluid.
The Reservoir holds approximately 1.5 gallons / 5.5 liters. Use care to keep the fluid clean when
filling the Reservoir.
Important
: The Power Units currently shipping with the P-9000LT/F hold approximately
1.5 gallons / 5.5 liters of Hydraulic Fluid. If different Power Units are substituted in
the future, which occasionally happens, you could end up with a Power Unit with a
different sized Hydraulic Fluid Reservoir. If 1.5 gallons / 5.5 liters does not seem like
an appropriate amount of Hydraulic Fluid for the Reservoir on your Power Unit, fill
the Reservoir up to the MAX line on the Reservoir or to .5 in / 12.5 mm under the
Reservoir Cap instead.
Approved fluids are any general purpose ISO-32, ISO-46, or ISO-68 hydraulic fluid or approved
automatic transmission fluids such as Dexron III, Dexron VI, Mercon V, Mercon LV, or any synthetic
multi-Vehicle automatic transmission fluid.
3.
If the Reservoir is low, add approved fluid until the fluid level is at least at the minimum level;
maximum level is best.
If your Reservoir does not have MAX/MIN markings, full is approximately .5 in / 12.5 mm under the
Reservoir Cap.
4.
When the Reservoir is filled, put the Reservoir Cap back on.
Содержание P-9000LT
Страница 50: ...P 9000LT F Low Rise Pit Lift 50 P N 5900022 Rev B Nov 2019 Wiring Diagrams 5585020 5585015 ...
Страница 52: ...P 9000LT F Low Rise Pit Lift 52 P N 5900022 Rev B Nov 2019 Labels ...
Страница 53: ...P 9000LT F Low Rise Pit Lift 53 P N 5900022 Rev B Nov 2019 ...
Страница 54: ...P 9000LT F Low Rise Pit Lift 54 P N 5900022 Rev B Nov 2019 ...
Страница 55: ...P 9000LT F Low Rise Pit Lift 55 P N 5900022 Rev B Nov 2019 Parts Diagrams ...
Страница 56: ...P 9000LT F Low Rise Pit Lift 56 P N 5900022 Rev B Nov 2019 ...
Страница 57: ...P 9000LT F Low Rise Pit Lift 57 P N 5900022 Rev B Nov 2019 ...
Страница 58: ...P 9000LT F Low Rise Pit Lift 58 P N 5900022 Rev B Nov 2019 ...
Страница 59: ...P 9000LT F Low Rise Pit Lift 59 P N 5900022 Rev B Nov 2019 ...
Страница 60: ...P 9000LT F Low Rise Pit Lift 60 P N 5900022 Rev B Nov 2019 ...
Страница 61: ...P 9000LT F Low Rise Pit Lift 61 P N 5900022 Rev B Nov 2019 ...
Страница 62: ...P 9000LT F Low Rise Pit Lift 62 P N 5900022 Rev B Nov 2019 ...
Страница 63: ...P 9000LT F Low Rise Pit Lift 63 P N 5900022 Rev B Nov 2019 Maintenance Log ...
Страница 64: ...1645 Lemonwood Drive Santa Paula CA 93060 USA 2019 by BendPak Inc All rights reserved bendpak com ...