29
STEP 18
(Bleeding)
1. Lift must be fully lowered before changing or adding
fluid.
2. Raise and lower lift six times. The Cylinder is self-
bleeding. After bleeding system, fluid level in power unit
reservoir may be down. Add more fluid if necessary to
raise lift to full height. It is only necessary to add fluid to
Raise lift to full height.
3. To pressure test, run lift to full rise and run motor
for approximately 3-seconds after lift stops. This will put
pressure on the hydraulic system. Stop and check all fit
-
tings and hose connections. Tighten or reseal if required.
POST-INSTALLATION CHECK-OFF
n
Columns properly shimmed and stable
n
Anchor Bolts tightened
n
Pivot / Sheave Pins properly attached
n
Electric power supply confirmed
n
Cables adjusted properly
n
Safety Locks functioning properly
n
Check for hydraulic leaks
n
Oil level
n
Lubrication of critical components
n
Check for overhead obstructions
n
All Screws, Bolts, and Pins securely fastened
n
Surrounding area clean
n
Operation, Maintenance and Safety Manuals
on site.
n
Perform an Operational Test with a typical vehicle
Содержание HDS-14
Страница 8: ...8 Assembly View ...
Страница 24: ...24 ...
Страница 31: ...31 Adapter Plate Required for HD 9 12 14 HDS 14 Adapter Plate Required for HD 9 12 14 HDS 14 ...
Страница 36: ...36 ...
Страница 37: ...37 ...
Страница 47: ...47 ...
Страница 53: ...53 ...
Страница 54: ...54 This page left intentionally blank ...
Страница 55: ...55 This page left intentionally blank ...