14
STEP 5
(Powerside Runway Installation)
1. Locate the Powerside Runway easily identified by the
Cylinder and sheave roller mounting structures welded on
the underside. The Powerside Runway will be positioned
on the side of the lift where the power unit is installed.
(See Fig. 5.1)
2. Install the Cylinder and Cable Block as shown. Ensure the
snap ring is installed on the cylinder rod. (See Fig. 6.2 - 6.3)
3. Remove any pre-installed Cable Sheaves and Spacers
from the Powerside Runway making sure to pay attention to
the order in which they are removed. Remove the Sheave
Pin Retaining Screws, then Remove Pin and Sheaves.
(This will help at the time of re-installation.) (See Page 15)
4. Position the Powerside Runway on top of the Cross
Tubes with the Utility Rail towards the center. The fitting
holes located at the side of the Powerside Runway should
be adjacent to the Power Unit Column. Align the holes in
the runway with the holes on the Cross Tubes and bolt
together using four M12 x 1.75 x 90 hex bolts and washers.
(See Fig. 5.5)
STEP 6
(Offside Runway Installation)
1. Position the Offside Runway on top of the Cross Tubes
with the Utility Rail located inside. (See Fig. 6.1)
DANGER !
DO NOT PROCEED with Cable installation or go near
the lift work area unless visual confirmation is made of
ALL Safety Locks. ALL locks MUST be engaged before
proceeding. Failure to comply with these instructions may
result in severe personal injury or death. (See page 13)
Fig 5.1
Fig 5.2
Fig 5.3
Fig 5.5
Fig 6.1
Fig 5.4
Содержание HDS-14
Страница 8: ...8 Assembly View ...
Страница 24: ...24 ...
Страница 31: ...31 Adapter Plate Required for HD 9 12 14 HDS 14 Adapter Plate Required for HD 9 12 14 HDS 14 ...
Страница 36: ...36 ...
Страница 37: ...37 ...
Страница 47: ...47 ...
Страница 53: ...53 ...
Страница 54: ...54 This page left intentionally blank ...
Страница 55: ...55 This page left intentionally blank ...