13
5. The Columns and Cross Tubes will now be in position
and spaced properly for the runways.
6. Thread the jam nut all the way to the Ladder. Install
the column TOP CAPS using the M16 x 2 Hex Bolts, nuts
& washers. Turn the Top Nut on each Safety Ladder until
the jam nut is touching the Ladder and the TOP CAP.
NOTE: The Ladder must never rest on the base of the
column or damage to the lift will occur. Be sure to position
the cable hole INWARD. (See Fig. 3.6 - 3.7)
STEP 4
(Raising The Cross Tubes)
1. Before proceeding it will be necessary to first raise the
Cross Tubes off the ground to facilitate Cable routing and
final assembly.
2. Manually raise the Cross Tubes until the Primary
Safety Locks engage and rest on the third or fourth lock
position or approximately 24” off the ground. It is impor-
tant that the SLACK SAFETY LOCK IS CLEARED. The
Slack Safety Lock must never rest on the Safety Ladder.
(See Fig. 4.1 -4.3)
3. Manually raise the Cross Tubes until the Primary
Safety Locks engage and rest on the third or fourth lock
position or approximately 24” off the ground.
(See Fig. 4.4)
DANGER !
Be careful not to disturb the Columns and Cross Tubes
as they may tip over causing personal injury or harm.
IMPORTANT NOTE !
It is important that the SLACK SAFETY LOCK IS
CLEARED. The slack safety lock must never
rest on the safety ladder.
Fig 3.6
Fig 4.1
Fig 4.2
Fig 4.3
Fig 3.7
The Ladder must
never rest on the
base of the col-
umn or damage to
the lift will occur
Fig 4.4
Turn the Top Nut
on each Safety
Ladder until the
jam nut is touching
the Ladder and the
TOP CAP
Содержание HDS-14
Страница 8: ...8 Assembly View ...
Страница 24: ...24 ...
Страница 31: ...31 Adapter Plate Required for HD 9 12 14 HDS 14 Adapter Plate Required for HD 9 12 14 HDS 14 ...
Страница 36: ...36 ...
Страница 37: ...37 ...
Страница 47: ...47 ...
Страница 53: ...53 ...
Страница 54: ...54 This page left intentionally blank ...
Страница 55: ...55 This page left intentionally blank ...