Installation, connection and commissioning
27
isoEV425_D00126_09_M_XXEN/03.2019
Wiring diagram legend:
Terminal
Connections
A1, A2
Connection to the supply voltage
U
s
via a fuse:
If supplied from an IT system, both lines have to be protected by a
fuse.*
E, E, KE
Connect each terminal separately to PE:
The same wire cross section as for
"A1", "A2" is to be used.
L1/+, L2/–
Connection to the 3(N)AC, AC or DC system to be monitored.
Up, AK1,
GND, AK2
Connect the terminals of the AGH420 to the corresponding
terminals of the ISOMETER®.
T/R
Connection for external combined test and reset button.
11, 14
Connection to alarm relay
"K1"
11, 24
Connection to alarm relay
"K2"
A, B
RS-485 communication interface with selectable terminating resist-
ance.
* For UL applications:
Only use 60/75°C copper lines!
UL and CSA applications require the supply voltage U
s
to be
protected via 5 A fuses.
Содержание AGH420
Страница 67: ...Technical data 67 isoEV425_D00126_09_M_XXEN 03 2019...
Страница 70: ......
Страница 71: ......