background image

Page 41

A

C

C

OL

ADE

  

2000

Gledhill

 (Water Storage) 

Ltd

AMD. JUNE 2008

CONDITIONS OF SALE & GUARANTEE TERMS

1.

Gledhill (Water Storage) Ltd (“We” or “Gledhills”) only do business upon the Conditions which appear below 

and no other.  Unless we so agree in writing these Conditions shall apply in full to any supply of goods by us to 
the exclusion of any Conditions or terms sought to be imposed by any purchaser.  These Conditions of Sale and 
Warranty Terms override those which are contained on the Invoice Forms and all Sales are now subject to these 
Conditions of Sale and Warranty terms only.

2.

PRICE

Once an order or call off has been accepted the price will be held for three months 

but if delivery is extended 

beyond that period at the customer’s request, then we reserve the right to amend the price when necessary.

  

The company reviews its pricing annually to adjust for changes in our cost base.  We reserve the right to alter prices 
at any time for severe movements in raw materials (mainly copper and steel).  If there is to be a change we will give 
customers at least four weeks notice but anything delivered after that date will be at the revised price.  An order 
may not be cancelled or varied after acceptance without the written consent of the company.  Such cancellation or 
variation shall be subject to such reasonable charges as may be appropriate.

3.

SPECIFICATION

The goods are supplied in accordance with the Specifications (if any) submitted to the Purchaser and any additions 
and alterations shall be the subject of an extra charge.  Any goods not so specified shall be in accordance with our 
printed  literature  or  the  literature  of  any  of  our  component  suppliers  (subject  to  any  modifications  made  since 
publication).  If we adopt any changes in construction or design of the goods, or in the specification printed in our 
literature, the Purchaser shall accept the goods so changed in fulfilment of the order.

4.

PAYMENT

The invoice price of goods shall be payable within 30 days of despatch by us of our invoice for the goods or such 
longer time as may be stated by our quotation or invoice.  If we receive payment in full on or before the due date we 
will allow an appropriate settlement discount except where we have quoted a special net price.  If payment is not 
received in full on or before the due date we shall be entitled in addition to the invoice price to:
(i)

payment of a sum equal to any increase in the copper price supplement applicable to the particular goods 
sold between the date of receipt of order and the date of receipt of payment in full; and 

(ii)

interest on any part of the invoice price unpaid after the due date at the rate of 3% per annum over the base 
rate for the time being of HSBC Bank plc.

5.

TIME

We give estimates of delivery dates in good faith and time of delivery is not nor shall be made of the essence of any 
contract nor shall we be liable for any loss or damage occasioned by delay in delivery.

6.

DELIVERY

We deliver free normally by our own vehicles within 25 miles of any of our manufacturing depots.  Delivery to any 
place more than 25 miles from one of our manufacturing depots may be subject to our quoted delivery charges.  We 
reserve the right to make delivery of goods contained in one order by more than one consignment and at different 
times.  Where a period is agreed for delivery and such period is not extended by our Agreement, the Purchaser shall 
take delivery within that period.    If the Purchaser fails to take delivery, we shall be entitled at the Purchaser’s risk and 
expense to store the goods at the Purchaser’s premises or elsewhere and to demand payment as if they had been 
despatched.  Off loading at point of delivery shall be the responsibility of and be undertaken by the Purchaser.

7.

SHORTAGES OR DAMAGE

Goods must be inspected before signature of delivery note and any damage, shortage or discrepancy noted on the 
delivery note and the goods returned on the same vehicle.  The buyer must also give us immediate written notice of 
the damage, shortage or discrepancy so that we may prompt investigation.

8.

RETURN OF GOODS

Goods  may  not  be  returned  to  the  Company  except  by  prior  written  permission  of  an  authorised  officer  of  the 
Company  and  such  return  shall  be  subject  to  payment  by  the  Purchaser  of  handling  and  re-stocking  charges, 
transport and all other costs incurred by the Company.

9.

COMPANY LIABILITY AND GUARANTEE

9.1. Subject to the terms of these Conditions of Sale and Guarantee Terms Gledhills provide Guarantees in respect 

of specific products as set out in this clause.

9.2. Each Guarantee is strictly conditional upon the following:-
9.2.1. Complaints must be given to us immediately, before any action is taken, as responsibility cannot be accepted 

if repairs or renewals are attempted on site without our written approval.

9.2.2. The unit has been installed in accordance with our installation and service instructions and all relevant codes 

of practice and regulations in force at the time of installation.

9.2.3. All necessary inlet controls and safety valves have been fitted correctly. 
9.2.4. The unit has only been used for the storage of potable water supplied from the public mains.
9.2.5 Where  appropriate  the  unit  has  been  regularly  maintained  as  detailed  in  the  installation  and  service 

instructions

9.2.6. Defects caused by corrosion or scale deposits are not covered by any Guarantee.
9.2.7. Where we agree to rectify any defect we reserve the right to undertake the work on our own premises.
9.3. Guarantees are provided in respect of specified goods supplied by Gledhills as follows:-

(a) Domestic and Commercial Open Vented Cylinders and Tanks.

The copper storage vessel is guaranteed for ten years and if it proves to be defective either in materials or 
workmanship, we will either repair or supply replacement at our option with the closest substitute in the case 
of any obsolete product to any address in Great Britain.
(i)    free of all charge during the first year after delivery by us.
(ii) thereafter at a charge of one-tenth of the then current list price and any copper price supplement and 

delivery charge during the second year after delivery by us and increasing by a further one-tenth on the 
second and subsequent anniversary of delivery by us.

(b) Domestic Mains Fed Products [Primary Stores]

The copper storage vessel is guaranteed for five years and if it or any integral pipework as part of the storage 
vessel  assembly  proves  to  be  defective  either  in  materials  or  workmanship,  we  reserve  the  right  to  either 
repair or supply replacements or the closest possible substitute in the case of any obsolete product and will 
collect and deliver to any address in England, Wales and Scotland (excluding all Scottish Islands).
(i) free of all charge during the first year after delivery by us.
(ii) thereafter  at  a  charge  of  one-fifth  of  the  then  current  list  price  or  any  copper  price  supplement  and 

delivery charge during the second year after delivery by us increasing by a further one-fifth on the second 
and subsequent anniversary of delivery by us.

(c) Integrated Boiler and Storage Vessel Products and Stand Alone Boilers

In the case of the GulfStream range of products and the Gledhill boiler range of products,  Gledhill guarantees 
the heat exchanger (boiler) for material and construction faults for two years.  THE RESPONSIBILITY FOR THE 
EXECUTION OF THIS GUARANTEE LIES WITH THE INSTALLER.
The guarantee becomes null and void if the appliance is used incorrectly, or in the event of proven negligence 
or  incorrectly  implemented  repairs 

OR  FAILURE  TO  CARRY  OUT  THE  RECOMMENDED  INSPECTION/

MAINTENANCE

.  The guarantee also becomes null and void if changes are made to the appliance without our 

knowledge, or if the serial number on the appliance is removed or made illegible.

The annual service must be carried out by a competent 
installer  in  accordance  with  the  advice  given  by 
Gledhill and using Gledhill approved parts.

(d) Stainless Steel Unvented Cylinders

Gledhill guarantee the components including controls, 
valves and electrical parts for two years from the date 
of purchase.  IT SHOULD BE NOTED THAT THE FACTORY 
FITTED  TEMPERATURE  AND  PRESSURE  RELIEF  VALVE 
MUST  NOT  BE  REMOVED  OR  ALTERED  IN  ANY  WAY 
OR THE GUARANTEE WILL NOT BE VALID.  GLEDHILL 
WILL NOT BE RESPONSIBLE FOR ANY CONSEQUENTIAL 
LOSS OR DAMAGE HOWEVER IT IS CAUSED. 
The  guarantee  for  the  stainless  steel  vessel  is  for 
twenty five years if the original unit is returned to us 
AND PROVIDED THAT:
(i) It has been installed as per the Design, Installation 

&  Servicing  Instructions,  relevant  standards, 
regulations and codes of practice.

(ii) It has not been modified, other than by Gledhill.
(iii) It  has  not  been  subjected  to  wrong  or  improper 

use or left uncared for.

(iv) It  has  only  been  used  for  the  storage  of  potable 

water.

(v) It has not been subjected to frost damage.
(vi) The benchmark log book is completed after each 

annual service.

(vii) The unit has been serviced annually.
It should be noted that the guarantee does not cover:
-

the effects of scale build up

-

any labour charges associated with replacing the 
unit or  parts.

If  the  stainless  steel  vessel  proves  to  be  defective 
either  in  materials  or  workmanship  we  reserve  the 
right  to  either  repair  or  supply  replacements  or  the 
closest possible substitute in the case of any obsolete 
product and will collect and deliver to any address in 
England, Scotland and Wales (excluding all islands):
(i) free of charge during the first year after delivery by us.
(ii) thereafter  at  a  charge  of  one  twenty  fifth  of  the 

then  current  list  price  during  the  second  year 
after  delivery  by  us  and  increasing  by  a  further 
one  twenty  fifth  on  the  second  and  subsequent 
anniversary of delivery by us.

ACTION IN THE EVENT OF FAILURE
If  the  stainless  steel  cylinder  develops  a  leak  we  will 
ask for a deposit against the supply of a new one.  This 
will be refunded if the failure is within the terms of the 
warranty when it has been examined by us.

(e) Solar Panels and ancillary equipment

Gledhill  provides  a  five  year  warranty  for  defects  in 
the  collectors  (except  broken  glass  and  collector 
accessories  eg  metal  edgings).    If  the  collector 
demonstrably fails to meet one of the requirements of 
the standard DIN 4757 part 3 we will replace it free of 
charge based on the date of invoice.  We can not be 
responsible for damage caused by mechanical stress 
and/or changes caused by weather related influences.  
The  warranty  excludes  minor  surface  damage  that 
does  not  affect  performance  or  malfunction  due  to 
improper assembly or installation.

Please note:

-

Installation  must  have  been  carried  out  by  a 
licensed specialized company (heating contractor 
or  plumber)  following  the  version  of  installation 
instructions in force.

-

Gledhill  or  its  representative  was  given  the 
opportunity  to  check  complaints  on  site 
immediately after any defect occurred.

-

Confirmation  exists  that  the  system  was 
commissioned  properly  and    that  the  system 
was  checked  and  maintenance  was  performed 
annually  by  a  specialised  company  licensed  for 
this purpose.

(f) Components  of  our  products  other  than 
Storage Vessels and Integral Pipework.

We will either extend to the purchaser the same terms 
of  warranty  as  we  are  given  by  the  manufacturer  of 
the component or if the manufacturer does not give 
any warranty, replace free of charge any component 
which  becomes  defective  within  two  years  after  the 
date of the delivery by us and is returned to us at the 
purchaser’s expense but we shall not meet the cost of 
removal  or  shipping  or  return  of  the  component  or 
any  other  cost  charges  or  damages  incurred  by  the 
purchaser.
If the appliance manufactured by Gledhill incorporates 
a factory fitted scale inhibitor then during the period 

Содержание ACCOLADE 2000

Страница 1: ...ns before commencing installation and on completion leave adjacent in the pocket on the back of the appliance front panel In the interest of continuously improving the Accolade2000 range Gledhill Wate...

Страница 2: ...lades now include a Benchmark Installation Commissioning and Service Record Log Book Please read carefully and complete all sections relevant to the appliance installation The details of the Log Book...

Страница 3: ...ese appliances have been certified for safety and therefore it is important that these instructions are followed The appliance and installation specifications of the appliances must not be modified un...

Страница 4: ...ety Document No 635 and the Electricity at Work Regulations 1989 The detailed recommendationsarecontainedinthecurrentissueofthefollowingBritishStandards and Codes of Practices BS 5440 Pts 1 2 BS 5449...

Страница 5: ...d to be heated indirectly by a gas or oil fired boiler and are available for use with both openventedandsealedheatingsystems These appliancesarealsofittedwitha3kWimmersion heater for heating the hot w...

Страница 6: ...h c i t s e m o D 9 s e Y e v l a v e n o z r e t a w t o H 0 1 s e Y e v l a v e n o z g n i t a e h e c a p S 1 1 s e Y p m u p m e t s y S 2 1 s e Y e v l a v s s a p y b c i t a m o t u A 3 1 s e...

Страница 7: ...Page accolade 2000 1 0 design 1 2 technical data Indirect model photo Figure 1 1 Direct model photo T B A when available Figure 1 2...

Страница 8: ...liance and any other ancillary equipment The minimum airing cupboard dimensions and the clearances required for installation and service are shown in figure 1 3 The appliance is designed to be install...

Страница 9: ...ted Therefore the flow rate from the appliance depends upon the resistance of the hot water supply network capacityoftheincomingmainsand thecharacteristicsofthepressureregulating valve Typical hot wat...

Страница 10: ...M l e d o M f t h g i e H D h t d i W E h t p e D D I 0 2 1 0 9 8 1 0 0 7 0 0 6 D I 0 5 1 0 2 1 2 D I 0 8 1 0 5 3 2 D I 0 1 2 0 0 7 2 D 0 4 1 0 0 3 1 D 5 7 1 0 5 7 1 D 0 1 2 0 0 1 2 Note The appliance...

Страница 11: ...ly one common isolator for the Indirect Accolade appliance the boiler and any external controls It must provide complete electrical isolation for the whole heating and hot water system via a fused dou...

Страница 12: ...0 6 l o r t n o C r e t a e h n o i s r e m m I m o t t o B p o t s a e m a S e v l a v e n o z g n i t a e H m m 2 2 m m 8 2 e v l a v e n o z r e t a w t o H m m 2 2 m m 8 2 p m u p m e t s y S 0 5...

Страница 13: ...esigned to be connected directly to the mains without a check valve The hot water flow rate achievable from the Accolade 2000 is directly related to the adequacy of the cold water mains serving the pr...

Страница 14: ...utlet connection on the appliance However in larger dwellings with a number of bathrooms and en suites and long pipe runs the balanced cold supply must be provided with its own pressure regulating val...

Страница 15: ...e 2 of the Water Supply Regulations 1999 d A bidet can be supplied from the Accolade 2000applianceaslongasitisoftheoverrim flushingtypeandincorporatesasuitableair gap Dead leg volumes and secondary ho...

Страница 16: ...orrect model Plastic pipework All recommendations with regard to pipework systems in this manual are generally based on the use of BS EN Standard copper pipework and fittings However plastic pipework...

Страница 17: ...mostat is installed should be fitted with lock shield valves on both connections The bypass valve is set at the factory to 2m head but this should be adjusted on site by theinstallertoensurethattherei...

Страница 18: ...0o C to 110o C see BS 5449 1990 clause 16 2 When calculating the system water content the water content of the primary heat exchanger see table 2 1 must be included The expansion vessel requirements a...

Страница 19: ...anual Air Vent Figure 2 4 Schematic diagram of open vented heating system Cold feed expansion and safety open vent The cold feed connection is provided at the top of the appliance The safety open vent...

Страница 20: ...bovethe water level see diagram 1 Onto the ground drive parth or garden area Thepipeshoulddischargedownwards andbenomorethan100mmaboveground level A wire cage should be provided to prevent people comi...

Страница 21: ...pboards formed on bulkheads or at the mid span of a suspended floor In these cases the situation can be improved by placing the appliance on a suitable sound deadening material i e carpet underlay or...

Страница 22: ...pliance should be handled carefully to avoiddamageandtherecommendedmethod isshownopposite Furtherdetailsareprovided on page 2 of these instructions Before installation the site requirements should be...

Страница 23: ...t to check that they are compatible Written approval has already been obtained for Hepworth Hep2O BiTite John Guest Speedfit Yorkshire Tectite However as similar assurances cannot be obtained for Poly...

Страница 24: ...sily observed It shall also be installedinasizeandmaterialsuitableforusewithheatingfeedandexpansioncisterns in accordance with BS 5449 and should not have any other connections to it SS Model The expa...

Страница 25: ...ersion heater Inside immersion heater head Pump 3A Fuse Safety Limit thermostat Red LED_1 Contactor coil 2 Pole CO switch L N N N L L Room therm ostat Energy cut out thermostat Control thermostat prog...

Страница 26: ...T_1 Red LED_2 HW ON HT ON 2 Green LED 5A fuse A1 A2 1 2 3 4 2 pole CO switch L N E L N E Immersion heater L N E Pump L N E Pump N N To Boiler E L L N N E E L L S L N N E E To Room thermostat L 2 From...

Страница 27: ...Ver 260603 A1 A2 1 2 3 4 E L N E N ON PEAK Supply 230V 16A 50Hz L L N E L SL Ranco OHT_1 Red LED L N E OFF PEAK Supply 230V 16A 50Hz TOP On Peak IH L N E TOP Peak IH L N E A1 A2 1 2 3 4 BOTOM Off Pea...

Страница 28: ...the connections as shown opposite on the terminal strip provided The appliance is provided with a link between terminals 11 and 12 on the terminal strip This must be removed if a room thermostat is fi...

Страница 29: ...heexternalwiringthroughtheserviceslot provided in the base of the appliance Make the connections as shown opposite on the terminal strip provided Before switching on the electrical supply check all th...

Страница 30: ...must be followed Cleansing the Primary System It is very important to ensure that the Primary system is cleaned using a suitable cleansing agent such as Sentinel X300 or Fernox Superfloc to ensure tha...

Страница 31: ...1 Do ensure that the electrical connections e g mains supply room thermostat to the unit are correct and tight 2 Do ensure that the functioning and control of the system is explained to the occupant...

Страница 32: ...conspicuous external position DO check the pump setting to give a temperature difference across the flow and return of not more than 11 C DO ensure that the bypass valve is set correctly DON T use pi...

Страница 33: ...pump has been replaced to ensure that any air is adequately vented 1 m o r f n e e r c s e h t e v o m e r f f o d e n r u t y l p p u s r e t a w e h t h t i W f f o n a e l c d n a e v l a v t e l n...

Страница 34: ...l a V e n o Z r e t a W t o H d a e h e l b a v o m e r h t i w l l e w y e n o H 0 1 e v l a V s s a p y B c i t a m o t u A p a m o C 1 1 e v l a V m u u c a V i t n A 6 5 0 T G 2 1 O R P O R P O R...

Страница 35: ...Page 35 accolade 2000 3 0 SERVICING 3 3 SHORT PARTS LIST 1 2 3 4 5 6 10 12 8 9 15 16 17 19 20 21 7 11 13 14 18...

Страница 36: ...ES If the units are not getting hot and the heat source is electrical ensure that the immersion heaters are isolated from the mains before re setting the energy cut out If the immersion heater s need...

Страница 37: ...ONS FOR SHOWERS 4 FIXING OPTIONS FOR TAPS MIXERS 1 MK Range Combined Regulators Aerator for screwing onto Taps Mixers with internal or external threads on their noses AntiVandal models also available...

Страница 38: ...6mm fixing holes 18 l mm 12 l mm 9 l mm 9 l mm 9 l mm 9 l mm 12 l mm inlet 55mm 18 l mm 12 l mm 9 l mm 9 l mm 9 l mm 9 l mm 9 l mm 9 l mm 9 l mm 9 l mm 12 l mm inlet 165mm 595mm A hot B cold blank bl...

Страница 39: ...ation and the resistance characteristics of the pipes The examples presented below are for 15mm copper pipe in table 1 and for plastic pipework in table 2 The preferred solution where space will allow...

Страница 40: ...branched off the cold water main prior to the treatment device instead of the cold water manifold Any other isolating control valves and backflow protection devices should be provided as necessary to...

Страница 41: ...terials or workmanship we will either repair or supply replacement at our option with the closest substitute in the case of any obsolete product to any address in Great Britain i free of all charge du...

Страница 42: ...any other contract between the Purchaser and us which at the time of payment of the full price of the goods sold under this contract have been delivered to the Purchaser but not paid for in full c unt...

Страница 43: ......

Страница 44: ......

Отзывы: