background image

Page 21

A

C

C

OL

ADE

  

2000

2.0 INSTALLATION

The appliance is designed to be installed in an airing/cylinder cupboard and the 
relevant minimum dimensions are provided in section 1.2 Technical Data.

Because of the ease of installation we recommend that the cupboard construction is 
completed and painted before installation of the appliance.  The cupboard door can 
be fitted after installation.

If the unit needs to be stored prior to installation it should be stored upright in a dry 
environment and on a level base/floor.

Installation and maintenance access is needed to the front of the appliance and 
above the F & E cistern.  See section 1.2 Technical Data for further details.  

The  minimum  dimensions  contained  in  section  1.2 Technical  Data  allow  for  the 
passage/connection  of  pipes  to  the  appliance  from  any  direction  as  long  as  the 
appliance is installed on the installation base provided. If the installation base is not 
used extra space may be needed to allow connection to the pipework and the whole 
of the base area should be continuously supported on a material which will not easily 
deteriorate if exposed to moisture.

The floor of the cupboard needs to be level and even and capable of supporting 
the weight of the appliance when full.  Details of the weight when full is provided in 
section 1.2 Technical Data.

The appliance is designed to operate as quietly as practicable.  However, some noise 
(from pumps etc) is inevitable in any heating system.  This will be most noticeable 
in cupboards formed on bulkheads, or at the mid span of a suspended floor.  In these 
cases the situation can be improved by placing the appliance on a suitable sound 
deadening material (i.e. carpet underlay or similar).

The  cylinder  is  very  well  insulated  and  no ventilation  is  normally  required  to  the 
cupboard. 

A suitable location will be needed for the separate feed and expansion cistern (OV 
model) or expansion vessel (SS model).   This will often be on top of the appliance 
itself or at high level in the cupboard housing the Accolade 2000.  The dimensions 
and clearances are provided in section 1.2 Technical Data.  The location will need 
to provide a suitable route for the cold feed/expansion pipe and safety/open vent 
pipe for the appliance (OV model) or the connecting pipe to the system expansion 
vessel (SS model).  A suitable route and discharge position for the warning/overflow 
pipe and the ballvalve supply from the mains cold water system will also be required with 
the OV model.

An electrical supply must be available which is correctly earthed, polarized and in 
accordance with the latest edition of the IEE requirements for electrical Installations BS 
7671.

The electrical mains supply needs to be 230V/50Hz/1Ph

Connection  must  be  made  using  a  double-pole  linked  isolator  with  a  contact 
separation of 3mm in both poles which is located within 1m of the appliance.  The 
supply must only serve the appliance.

The supply to all the indirect appliances shall be fused at 16 amp.

The on and off peak supplied to all the direct models shall each be fused at 16 amp.  
Normally these will be provided from a suitable off peak hot water controller located 
adjacent to the appliance.

2.1 SITE REqUIREMENTS

Содержание ACCOLADE 2000

Страница 1: ...ns before commencing installation and on completion leave adjacent in the pocket on the back of the appliance front panel In the interest of continuously improving the Accolade2000 range Gledhill Wate...

Страница 2: ...lades now include a Benchmark Installation Commissioning and Service Record Log Book Please read carefully and complete all sections relevant to the appliance installation The details of the Log Book...

Страница 3: ...ese appliances have been certified for safety and therefore it is important that these instructions are followed The appliance and installation specifications of the appliances must not be modified un...

Страница 4: ...ety Document No 635 and the Electricity at Work Regulations 1989 The detailed recommendationsarecontainedinthecurrentissueofthefollowingBritishStandards and Codes of Practices BS 5440 Pts 1 2 BS 5449...

Страница 5: ...d to be heated indirectly by a gas or oil fired boiler and are available for use with both openventedandsealedheatingsystems These appliancesarealsofittedwitha3kWimmersion heater for heating the hot w...

Страница 6: ...h c i t s e m o D 9 s e Y e v l a v e n o z r e t a w t o H 0 1 s e Y e v l a v e n o z g n i t a e h e c a p S 1 1 s e Y p m u p m e t s y S 2 1 s e Y e v l a v s s a p y b c i t a m o t u A 3 1 s e...

Страница 7: ...Page accolade 2000 1 0 design 1 2 technical data Indirect model photo Figure 1 1 Direct model photo T B A when available Figure 1 2...

Страница 8: ...liance and any other ancillary equipment The minimum airing cupboard dimensions and the clearances required for installation and service are shown in figure 1 3 The appliance is designed to be install...

Страница 9: ...ted Therefore the flow rate from the appliance depends upon the resistance of the hot water supply network capacityoftheincomingmainsand thecharacteristicsofthepressureregulating valve Typical hot wat...

Страница 10: ...M l e d o M f t h g i e H D h t d i W E h t p e D D I 0 2 1 0 9 8 1 0 0 7 0 0 6 D I 0 5 1 0 2 1 2 D I 0 8 1 0 5 3 2 D I 0 1 2 0 0 7 2 D 0 4 1 0 0 3 1 D 5 7 1 0 5 7 1 D 0 1 2 0 0 1 2 Note The appliance...

Страница 11: ...ly one common isolator for the Indirect Accolade appliance the boiler and any external controls It must provide complete electrical isolation for the whole heating and hot water system via a fused dou...

Страница 12: ...0 6 l o r t n o C r e t a e h n o i s r e m m I m o t t o B p o t s a e m a S e v l a v e n o z g n i t a e H m m 2 2 m m 8 2 e v l a v e n o z r e t a w t o H m m 2 2 m m 8 2 p m u p m e t s y S 0 5...

Страница 13: ...esigned to be connected directly to the mains without a check valve The hot water flow rate achievable from the Accolade 2000 is directly related to the adequacy of the cold water mains serving the pr...

Страница 14: ...utlet connection on the appliance However in larger dwellings with a number of bathrooms and en suites and long pipe runs the balanced cold supply must be provided with its own pressure regulating val...

Страница 15: ...e 2 of the Water Supply Regulations 1999 d A bidet can be supplied from the Accolade 2000applianceaslongasitisoftheoverrim flushingtypeandincorporatesasuitableair gap Dead leg volumes and secondary ho...

Страница 16: ...orrect model Plastic pipework All recommendations with regard to pipework systems in this manual are generally based on the use of BS EN Standard copper pipework and fittings However plastic pipework...

Страница 17: ...mostat is installed should be fitted with lock shield valves on both connections The bypass valve is set at the factory to 2m head but this should be adjusted on site by theinstallertoensurethattherei...

Страница 18: ...0o C to 110o C see BS 5449 1990 clause 16 2 When calculating the system water content the water content of the primary heat exchanger see table 2 1 must be included The expansion vessel requirements a...

Страница 19: ...anual Air Vent Figure 2 4 Schematic diagram of open vented heating system Cold feed expansion and safety open vent The cold feed connection is provided at the top of the appliance The safety open vent...

Страница 20: ...bovethe water level see diagram 1 Onto the ground drive parth or garden area Thepipeshoulddischargedownwards andbenomorethan100mmaboveground level A wire cage should be provided to prevent people comi...

Страница 21: ...pboards formed on bulkheads or at the mid span of a suspended floor In these cases the situation can be improved by placing the appliance on a suitable sound deadening material i e carpet underlay or...

Страница 22: ...pliance should be handled carefully to avoiddamageandtherecommendedmethod isshownopposite Furtherdetailsareprovided on page 2 of these instructions Before installation the site requirements should be...

Страница 23: ...t to check that they are compatible Written approval has already been obtained for Hepworth Hep2O BiTite John Guest Speedfit Yorkshire Tectite However as similar assurances cannot be obtained for Poly...

Страница 24: ...sily observed It shall also be installedinasizeandmaterialsuitableforusewithheatingfeedandexpansioncisterns in accordance with BS 5449 and should not have any other connections to it SS Model The expa...

Страница 25: ...ersion heater Inside immersion heater head Pump 3A Fuse Safety Limit thermostat Red LED_1 Contactor coil 2 Pole CO switch L N N N L L Room therm ostat Energy cut out thermostat Control thermostat prog...

Страница 26: ...T_1 Red LED_2 HW ON HT ON 2 Green LED 5A fuse A1 A2 1 2 3 4 2 pole CO switch L N E L N E Immersion heater L N E Pump L N E Pump N N To Boiler E L L N N E E L L S L N N E E To Room thermostat L 2 From...

Страница 27: ...Ver 260603 A1 A2 1 2 3 4 E L N E N ON PEAK Supply 230V 16A 50Hz L L N E L SL Ranco OHT_1 Red LED L N E OFF PEAK Supply 230V 16A 50Hz TOP On Peak IH L N E TOP Peak IH L N E A1 A2 1 2 3 4 BOTOM Off Pea...

Страница 28: ...the connections as shown opposite on the terminal strip provided The appliance is provided with a link between terminals 11 and 12 on the terminal strip This must be removed if a room thermostat is fi...

Страница 29: ...heexternalwiringthroughtheserviceslot provided in the base of the appliance Make the connections as shown opposite on the terminal strip provided Before switching on the electrical supply check all th...

Страница 30: ...must be followed Cleansing the Primary System It is very important to ensure that the Primary system is cleaned using a suitable cleansing agent such as Sentinel X300 or Fernox Superfloc to ensure tha...

Страница 31: ...1 Do ensure that the electrical connections e g mains supply room thermostat to the unit are correct and tight 2 Do ensure that the functioning and control of the system is explained to the occupant...

Страница 32: ...conspicuous external position DO check the pump setting to give a temperature difference across the flow and return of not more than 11 C DO ensure that the bypass valve is set correctly DON T use pi...

Страница 33: ...pump has been replaced to ensure that any air is adequately vented 1 m o r f n e e r c s e h t e v o m e r f f o d e n r u t y l p p u s r e t a w e h t h t i W f f o n a e l c d n a e v l a v t e l n...

Страница 34: ...l a V e n o Z r e t a W t o H d a e h e l b a v o m e r h t i w l l e w y e n o H 0 1 e v l a V s s a p y B c i t a m o t u A p a m o C 1 1 e v l a V m u u c a V i t n A 6 5 0 T G 2 1 O R P O R P O R...

Страница 35: ...Page 35 accolade 2000 3 0 SERVICING 3 3 SHORT PARTS LIST 1 2 3 4 5 6 10 12 8 9 15 16 17 19 20 21 7 11 13 14 18...

Страница 36: ...ES If the units are not getting hot and the heat source is electrical ensure that the immersion heaters are isolated from the mains before re setting the energy cut out If the immersion heater s need...

Страница 37: ...ONS FOR SHOWERS 4 FIXING OPTIONS FOR TAPS MIXERS 1 MK Range Combined Regulators Aerator for screwing onto Taps Mixers with internal or external threads on their noses AntiVandal models also available...

Страница 38: ...6mm fixing holes 18 l mm 12 l mm 9 l mm 9 l mm 9 l mm 9 l mm 12 l mm inlet 55mm 18 l mm 12 l mm 9 l mm 9 l mm 9 l mm 9 l mm 9 l mm 9 l mm 9 l mm 9 l mm 12 l mm inlet 165mm 595mm A hot B cold blank bl...

Страница 39: ...ation and the resistance characteristics of the pipes The examples presented below are for 15mm copper pipe in table 1 and for plastic pipework in table 2 The preferred solution where space will allow...

Страница 40: ...branched off the cold water main prior to the treatment device instead of the cold water manifold Any other isolating control valves and backflow protection devices should be provided as necessary to...

Страница 41: ...terials or workmanship we will either repair or supply replacement at our option with the closest substitute in the case of any obsolete product to any address in Great Britain i free of all charge du...

Страница 42: ...any other contract between the Purchaser and us which at the time of payment of the full price of the goods sold under this contract have been delivered to the Purchaser but not paid for in full c unt...

Страница 43: ......

Страница 44: ......

Отзывы: