Page 29
A
C
C
OL
ADE
2000
2.0 INSTALLATION
Before commencing the electrical work check
that the power source is in accordance with
section 1.2 Site Requirements and ensure that
it is isolated.
When installing the indirect unit the boiler
manufacturers wiring instructions should be
read in conjunction with this manual.
Run the external wiring through the service slot
provided in the base of the appliance.
Make the connections as shown opposite on
the terminal strip provided.
before switching on the electrical supply
check all the factory made terminal
connections to ensure they have not become
loose during transit and that the appliance
is full of water.
frost Protection
When frost protection is required for the
whole house set the programmer to constant
during the time required and adjust the room
thermostat to a suitable setting.
2.2 INSTALLATION
Содержание ACCOLADE 2000
Страница 35: ...Page 35 accolade 2000 3 0 SERVICING 3 3 SHORT PARTS LIST 1 2 3 4 5 6 10 12 8 9 15 16 17 19 20 21 7 11 13 14 18...
Страница 43: ......
Страница 44: ......