3
1.0
APPLIANCE COMMISSIONING CHECKLIST
It is the installers responsibility to complete the following checklist when commissioning this appliance. The
informaon recorded on this page may be requested at the me of any warranty call made. If the informaon
is not made available it may affect the warranty support for the customers appliance.
CHECK LISTS
PASS
FAIL
Check flue is suitable for this appliance
Check flue flow prior to installaon
Check spillage aer installaon
Check standing gas pressure
mbar
Check working pressure on full rate (Min. 18.5)
Ensure all other gas appliances are running on full rate
mbar
Complete relevant secon of warranty forms , ensure it is complete with Gas Safe
registraon details.
Instruct the customer on lighng, maintenance and servicing procedures. (Including
glass removal and ceramic placement)
If you can smell gas, immediately turn off the gas supply using the control valve at the meter in your home.
Do not smoke and turn off all sources of ignion, i.e. boilers or gas hobs. Open windows and doors to venlate
the room or building.
Call the Gas Emergency Service
0800 111 999 (England Scotland and Wales)
0800 002 002 (N. Ireland)
Installaon Date
Gas Engineer Name
Appliance Serial Number
Gas Safe Engineer Regis-
traon No.
Gas Safe Engineer contact
No.
Safety Check
D
A
T
A
P
L
A
T
E
L
O
C
A
T
I
O
N
Содержание 600CF
Страница 52: ...52 This page is inten onally le blank ...
Страница 53: ...53 This page is inten onally le blank ...