28
Installation RS20/RS30-...U
Release 03 08/2019
2
Installation
The devices have been developed for practical application in a harsh
industrial environment.
On delivery, the device is ready for operation.
Perform the following steps to install and configure the device:
Installing and grounding the device
Installing an SFP transceiver (optional)
Filling out the inscription label
2.1
Checking the package contents
Proceed as follows:
Check whether the package includes all items named in the section
“Scope of delivery” on page 43
Check the individual parts for transport damage.
2.2
Installing and grounding the device
WARNING
FIRE HAZARD
Install the device in a fire protected enclosure according to EN 60950-1.
Failure to follow these instructions can result in death, serious injury,
or equipment damage.
Содержание Hirschmann RS20 U Series
Страница 48: ......