- 11 -
Operation notice
:
1. OM can only be switched when the boom is fully retracted.
2.
Under the load lifting status of the RT crane, the OM switch between
360 lifting and front lifting is automatically done by the LMI based on
the rotating field of the boom.
3. LMI bypass icon will be displayed on main interface if bypass switch
is activated. The status will be displayed for 30 minutes and then
automatically close. To cancel the LMI bypass condition, deactivate
the bypass signal.
4.1 Data display interface
(
values are not real
)
The Data display (320×240) is an LED display with background illumination and
extended temperature range, on which essential data are displayed. The data
is dependent on the operating mode, such as load values, geometry and crane
data, symbols, etc.
Main interface (values shown are for illustration):
a
b
c
d
e
5
11
4
6
7
1
2
3
14
13
9
17
16
18
15
10
12
19