Содержание H2AIR ARCH

Страница 1: ...H2AIR ARCH Belanger Inc P O Box 5470 Northville MI 48167 5470 Customer Service Phone 248 349 7010 Fax 248 380 9681 www Belangerinc com 1MANUL958 REV 00 ...

Страница 2: ......

Страница 3: ...ional copies of this manual or electronically transmit it in any form whatsoever in whole or in part without the prior written permission of Belanger Inc The registered trademarks used in this document are the property of their respective owners The use of such trademarks is for reference purposes only and does not imply sponsorship or approval of Belanger Inc by these companies or any companies a...

Страница 4: ......

Страница 5: ... Assembly 19 Tunnel Placement 21 Connect Water Hoses from Leg Assemblies to Water Manifold 25 Route LED Cables from Leg Assemblies to Electrical Box 26 Utilities 27 Electrical Connection Main Power to DryLite Dryer Motors 27 Electrical Connection H2Air Air Panel to Controller 28 Electrical Connection Airis Air Panel to Controller 28 Electrical Connections Overview for LEDs 29 Electrical Connection...

Страница 6: ... Assembly Motor and Impeller Assemblies 49 H2AIR Dryer Assembly DryLite Air Cannon Nozzle Assembly 50 Airis Air Cannon Dual Kit Overview 111391 51 Airis Clock Wise Assembly 111385 52 Airis Counter Clockwise Assembly 111388 53 Air Panel for H2AIR Dryer Assembly 110469 54 Air Panel for Airis Assembly 111389 54 H2AIR Top Assembly Overview 55 Water Manifold Assembly 111533 56 Top Manifold Assembly 111...

Страница 7: ...oric Acid Ammonium Bi flouride Bromic Acid Muriatic Acid Sulfonic Acid Phosphoric Acid Hydrogen Cyanide Hydrochloric Acid Sodium Hydroxide and Chlorinated Solvents 5 Seller makes no warranty express or implied with respect to the design or operation of any entire system in which Seller s goods sold hereunder are mere components 6 In no event shall Seller be liable for any incidental special conseq...

Страница 8: ...ed Warranty of the Belanger Terms and Conditions of Sales describes the potential limitation of warranty due to your chemical selection 4 This warranty shall be void for all equipment failures and premature component wear caused by the use of corrosive chemicals in the wash process The following list includes some but not all of the particularly corrosive chemicals that if used in conjunction with...

Страница 9: ...d in this manual and on warning labels tell you the seriousness of particular safety hazards The precautions that follow must be followed to prevent death injury or damage to the equipment DANGER This signal word is used to alert you to a hazard or unsafe practice which WILL RESULT IN DEATH OR SERIOUS INJURY This alerts you to a hazard or unsafe practice which COULD RESULT IN DEATH OR SERIOUS INJU...

Страница 10: ...ble machinery or equipment thereby preventing the release of hazardous energy while employees perform servicing and maintenance activities The standard outlines measures for controlling hazardous energies electrical mechanical hydraulic pneumatic chemical thermal and other energy sources Note Reference the OSHA standard 29 CFR 1910 331 to 29 CFR 1910 335 for safe work practices to protect employee...

Страница 11: ... ROTATING AND OR MOVING COMPONENTS COULD RESULT IN SERIOUS INJURY OR DEATH BE AWARE OF FOREIGN OBJECTS IN THE AREA SURROUNDING A ROTATING PIECE OF EQUIPMENT OBJECTS MAY BECOME TANGLED WITH EQUIPMENT AND COULD RESULT IN SERIOUS INJURY OR DEATH BE AWARE OF HAZARDS ASSOCIATED WITH EQUIPMENT INSTALLED ON THE FLOOR THAT MAY BE A TRIP HAZARD It is imperative to your safety and the safety of others to al...

Страница 12: ...g Assembly has two spray manifolds one manifold is positioned to have the spray nozzles at an angle of 25 toward the entrance and in the other manifold the nozzles are at an angle of 25 toward the exit of the tunnel The Top Assembly also has two spray manifolds that rotate with the Top Flip Assembly Together the Leg Manifolds and Top Manifolds provide a complete rinising on all of the surfaces of ...

Страница 13: ...ead Beam 1 Clockwise DryLite Air Cannon Dryer Housing 1 Counterclockwise DryLite Air Cannon Dryer Housing 1 Airis Air Cannon Dual Kit 1 H2AIR Top Manifold Assembly with LED Assemblies and Manifold Covers installed on Head Beam 1 H2AIR Arch Accessory Box 111504 1 H2AIR Arch Accessory Box contents 111504 Part Number Qty Description 1FSTNR ST750 8 Kwick Bolt 3 Zinc 5 8 x 6 1CLAMP467 4 Clamp Single Ea...

Страница 14: ...anifold Covers Color 1PLSTC CV238 111517 Natural Hardware components that are used with the Leg Manifold Covers Part Number Quanity Description 1WASHR FL415 4 5 16 Stainless Steel Flat Washer 2 Per Cover 1WASHR LC270 4 5 16 Stainless Steel Lock Washer 2 Per Cover 1FSTNR HK275 4 5 16 18 x 5 8 Black Hand Knob 2 Per Cover 1GRMIT850 16 SBR 60A 2 1 2 PHD x 2 1 4 ID 1 4P 30D 5 8W Black 8 Per Cover ...

Страница 15: ... Panel H2AIR Top Flip Cylinder Two 2 1 4 poly flow airlines from H2AIR Air Panel to H2AIR Top Flip Cylinder ports Airis Extend Retract Airlines Two 2 3 8 poly flow airlines from Airis Air Panel to top center of the H2AIR Arch Airis Extend Retract Airlines FFour 4 1 4 poly flow airlines tee off of 3 8 airlines route appropriate lines to ports on Airis Assemblies Electrical Specifications for Motors...

Страница 16: ...248 349 7010 Fax 248 380 9681 1MANUL958 Specifications Dimensions 131 3 4 Unit Height 138 5 16 Unit Width 90 1 4 Vehicle Clearance 139 1 2 Outside of Base Plate to Outside of Baseplate 36 Tunnel Space 40 Operating Envelope Includes Pivot of DryLite Dryers Not To Scale ...

Страница 17: ...ipping pallet install the Airis Assemblies onto the Air Cannon Dryer Housings 4 Locate the Airis Air Cannon Dual Kit shown below Note If there is any damaged equipment file a claim with the trucking company immediately Receiving party is responsible for filing claim with trucking company Notify your local distributor or Belanger Inc immediately if shipment is determined damaged or incomplete Shipp...

Страница 18: ...e image below Note A clockwise CW Airis is to be attached to a CW Air Cannon Blower Housing and a counter clockwise CCW Airis is to be attached to a CCW Air Cannon Blower Housing 6 Hold the Airis over the top of the Inlet Cone and select the four holes that will be used to mount the Airis assembly Air Cannon Blower Housing Air Cannon Outlet DryLite Air Cannon with Airis CW Assembly Shown Air Canno...

Страница 19: ...ners that hold the Air Cannon Inlet Cone 1IMPLR CO500 onto the Housing Inlet Adapter Flange 1IMPLR275 and set them aside 8 Remove the Inlet Cone 1IMPLR CO500 and set aside shown in the above right image 9 Use a flat screwdriver to remove the four Nut Retainers 1RETNR650 from the holes that the Airis will be mounted to these four retainers 1RETNR650 will not be reused in the assembly Inlet Cone Fla...

Страница 20: ... washers Using the 3 8 16 x 1 fasteners that you just removed install a lock washer and then one of the flat washers onto each of the four fasteners as shown below 12 In the Airis accessory box locate the Airis Support Mounting Stud Assemblies 111382 Install a Mounting Stud into each of the four open holes in the Adapter Flange 1IMPLR275 with the threaded stud facing out as shown above Images made...

Страница 21: ... reinstall four of the 5 16 18 x 1 fasteners lock washers and aluminum flat washers into the remaining Nut Retainers 1RETNR650 and tighten down the Inlet Cone 1IMPLR CO500 15 Install the Airis onto the four threaded studs making sure that the orientation is correct as shown in the images below 16 In the Airis accessory box locate four 3 8 16 Nyloc nuts 1NUT LC215 install and tighten them onto the ...

Страница 22: ... H2AIR Top Beam Assembly to a forklift and position it in the approximate location in the tunnel 3 Orient the H2AIR Top Assembly in the tunnel so the Belanger Logo faces the entrance of the tunnel and the DryLite Air Cannon Nozzles face the exit of the tunnel see image below Driver Side Passenger Side View from Entrance of Tunnel Shipping Bracket to be discarded Shipping Bracket to be discarded Nu...

Страница 23: ...ly to the Shipping Bracket 3 With the H2AIR Top Beam Assembly secured to the forklift raise it up so that the Leg Assemblies can be attached 4 Orient the legs on the driver and passenger side of the Head Beam with the manifolds facing the center of the tunnel refer to the image below Passenger Side Driver Side Head Beam Manifold Nozzle Port 8 per Leg PS Leg Assembly with Manifold facing toward the...

Страница 24: ...om each Leg Assembly into the Head Beam then through the openings near the center of the Head Beam as shown in the image below 7 Attach the Leg Assemblies to the Head Beam using the supplied fasteners and a 3 4 wrench as shown in the image above Head Beam Passenger Side Leg Assembly Utility Lines from PS Leg Assembly Slot for Utility Lines Slot for Utility Lines Utility Lines from DS Leg Assembly ...

Страница 25: ...or 2 Position the OUTSIDE edge of the driver side foot plate on the marked line which should be 42 3 4 from the inside edge of the guiderail and confirm the H2AIR is positioned at the desired location lengthwise in the tunnel 3 Before lagging the driver side leg in place verify the leg is plumb in all directions using a level 4 Shims may be used under the foot plate if necessary to make the driver...

Страница 26: ... floor 6 Next for the passenger side foot plate measure 139 from the OUTSIDE edge of the driver side foot plate toward the passenger side of the tunnel and mark a line at this distance on the floor Note Remember to verify where any underground heat or utilities run so you can be sure to not drill into them with the hammer drill when making the lag holes Note Do not hammer the lag bolts all the way...

Страница 27: ... another Measure from the exit end of the driver side foot plate to the entrance end of the passenger side foot plate Measure from the entrance end of the driver side foot plate to the exit end of the passenger side foot plate 9 Measure from the floor to the tip of the DryLite Dryer Nozzles as shown in the image above This measurement should be 90 1 4 shims or plates may be used if necessary to ac...

Страница 28: ...ate if necessary 11 Drill the lag holes in the concrete and use the supplied 5 8 lag bolts to secure the passenger foot plate to the floor Note Remember to verify where any underground heat or utilities run so you can be sure to not drill into them with the hammer drill when making the lag holes Note Do not hammer the lag bolts all the way down at this time leave room to raise the foot plate later...

Страница 29: ... the water hoses from the Leg Assemblies to the Water Manifold located 3 Connect the Water Hoses from the driver side Leg Assembly to the tee fittings on the Water Manifold as shown below 4 Connect the Water Hoses from the passenger side Leg Assembly to the tee fittings on the Water Manifold as shown above Water Hoses from PS Leg Asy Water Hoses from DS Leg Asy Water Manifold Step 4 Connect the tw...

Страница 30: ... the images below 2 Route the LED Cable from the passenger side Leg Assembly to the same Electrical Box as shown above 3 These cables will be connected to the main power in the Utilities section of this manual LED Cable for DS Leg Asy LED Cable for PS Leg Asy Step 2 Route the LED Cable from the PS Leg Asy to the Electrical Box on the driver side of the Top Flip Weldment Electrical Box for Leg Asy ...

Страница 31: ...tallations 2 When everything is wired properly close and seal the Electrical Boxes be cautious to not crimp down on any of the wires 3 Test to see if all the dryers are functioning properly by using the Controller to turn on each of the dryers Note The electrical connections are made with either heat shrink butt splices or dielectric grease wire nuts Note Make sure electrical box penetrations are ...

Страница 32: ...nt the Air Panel in a dry location 2 Wire the 4 Way Air Valve to the 120 VAC output on the carwash controller unit 120 VAC in It is recommended that a licensed electrician is contracted to perform all electrical installations All utilities MUST be installed in accordance with all local and national codes Air Panel 111389 120 VAC 4 Way Air Valve Retract Regulator Connection 1 4 Poly Flow Tube to th...

Страница 33: ... cables are ready to be wired to the Main Power Electrical Connections Main Power for DryLite Dryers Top Manifold LEDs 1 Remove the cover on the Electrical Box on the passenger side of the Top Flip Weldment shown below CAUTION It is recommended that a licensed electrician is contracted to perform all electrical installations 2 Route two Main Power Lines one for the Dryer Nozzles LEDs and one for t...

Страница 34: ... is contracted to perform all electrical installations 2 Route the Main Power Line for the Leg Assemblies LEDs from the Controller to the top of H2AIR and through the Cord Grip in the Electrical Box shown above 3 When everything is wired properly close and seal the Electrical Box be cautious to not crimp down on any of the wires 4 Test to see if the LEDs in the Leg Assemblies are functioning prope...

Страница 35: ...ract regulator on the Air Panel to the retract port on the Top Flip Cylinder See the images above Retract Regulator Connection 1 4 Poly Flow Tube to the Retract Port on the Cylinder 120 VAC Output from the Site Controller Main Air Connection 1 4 Poly Flow Tube Extend Regulator Connection 1 4 Poly Flow Tube to the Extend Port on the Cylinder 4 Way Air Valve Field Supplied 1 4 Poly Flow Tube Route a...

Страница 36: ...airline to each Air Cannon and connect them to the extend ports on the Airis Cylinders 5 Connect two 1 4 poly flow airlines to the Union Y Fitting on the retract airline Route an airline to each Air Cannon and connect them to the retract port on the Airis Cylinders 6 Use the Controller to turn on the Airis Assemblies to confirm they are operating properly 7 Adjust the flow controls on each Cylinde...

Страница 37: ...trieve the two 3 4 Hose Clamps from the Accessory Box 3 Before connecting the Main Water Hoses to the Manifold run water through the hoses to flush out any unwanted debris that may be in the lines 4 Using the 3 4 Clamps secure the water hoses to the two 3 4 elbow fittings on the Water Manifold as shown in the image below 3 4 Main Water Hoses Water Manifold Step 4 Use the 3 4 Hose Clamps to secure ...

Страница 38: ...h Leg Manifold Assembly install eight 8 of the supplied Spray Nozzles into the Check Bodies refer to the image below Note Lubricate the Nozzle threads with a Liquid Teflon for easier installation and maintenance 4 Rotate each Spray Nozzle so it is installed at a 5 angle to the centerline of the Leg Manifold Be sure to rotate all of the nozzles in the same direction see the image below Apply Liquid...

Страница 39: ...es refer to the image below Note Lubricate the Nozzle threads with a Liquid Teflon for easier installation and maintenance 6 Rotate each Spray Nozzle so it is installed at a 5 angle to the centerline of the Manifold Be sure to rotate all of the nozzles in the same direction see the image below Apply Liquid Teflon to the Nozzle Threads at Installation Check Bodies Four 4 per Top Manifold Spray Nozz...

Страница 40: ...ough the tunnel The DryLite Air Cannon Nozzles will start at an angle of about 22 towards the entrance of the tunnel as shown below 9 Then as the vehicle travels on the conveyor through the H2AIR Arch the Top Flip Dryers and Top Manifold will pivot 40 and will have an end angle of approximately 20 towards the exit of the tunnel shown below H2AIR Dryer Nozzles Top Manifold pivoted toward the Entran...

Страница 41: ...rch the following functions start simultaneously Turn on Water for the Top and Leg Manifolds Turn on Air Cannon DryLite Dryers Activate the Airis 4 way valve to open the Airis Assemblies Turn on the LED Lights in the Leg Assemblies Top Manifolds and Dryer Housings 11 Run a test wash on a vehicle to confirm the H2AIR Arch is operating as desired and make adjustments as necessary Note It is recommed...

Страница 42: ... airlines for damage or wear Replace as necessary Inspect the arch for clogged nozzles This can best be done while running a test vehicle at the start of the business day Insert a thin wire into the nozzle opening to clear any obstructions Sometimes simply tapping on the nozzle can clear it Run a test wash H2AIR Arch Monthly Inspect all fasteners and anchors on the frame and any additional compone...

Страница 43: ...connections Check power coming to Air Panel Verify that the Controller has been programmed properly Check that air pressure on Air Panel has been set properly Check airlines connections at the Air Panel and the Airis Cylinders Airis Opening Closing Speed Air pressure settings Adjust the extend and retract air pressure on the Air Panel and or Adjust the flow control valves on the extend and retract...

Страница 44: ...r debris DO NOT use a power washer or high pressure water as this can wear and cause harm to the powder coated surface 2 Using a mild detergent and warm water clean the powder coat surface with a soft cloth sponge or a soft natural bristle brush DO NOT use water heated to a temperature above 140 F as this can wear and cause harm to the powder coated surface 3 Rinse the sponge or soft brush as need...

Страница 45: ...surface by washing it with a detergent and a non scratch scrub sponge Use a solution of warm water and non abrasive pH neutral pH 5 8 detergent to clean material prior to painting Thoroughly rinse and dry the surface If solvents are needed to remove marks a soft cloth dampened with Isopropyl Alcohol may be used Solvents containing esters ketones or chlorinated solvents must not be used without con...

Страница 46: ...each end of the stroke Patience On a warm day if each coat has been allowed to dry before the next application it should be possible to rub the paint down after about 30 minutes If it starts to drag and ball the paint leave it to dry further It will now have to be rubbed right back to a smooth surface again which may take another hour More patience is required The thinner the coats of paint the fa...

Страница 47: ...916 2 111651 See Note Above 111650 See Note on Left Important to Note Shipping Weldments 111650 111651 are to be removed to assemble Legs to Head Beam Discard 111650 111651 along with 1NUT RG603 8 1FSTNR HH540 4 per end 1WASHR LC498 4 per end 1NUT RG603 4 per end See Note Above Left Passenger Side Driver Side DS Leg Assembly with Manifold Hoses and LED RGB Assembly 111509 PS Leg Assembly with Mani...

Страница 48: ... Driver Side 111407 208V 111414 380V 111412 575V Top Flip CCW Motor Assembly Passenger Side 111408 208V 111415 380V 111413 575V Top Flip Mount Bracket Aluminum 111399 Silver PC 111400 Push Bar 111402 Cylinder Asy 111537 Driver Side Passenger Side View from Entrance Top Flip DryLite Dryer Complete Assembly 208V Aluminum 111538 Silver PC 111539 380V Aluminum 111541 Silver PC 111542 575V Aluminum 111...

Страница 49: ... Bracket Push Bar Cylinder Assembly 1WASHR LC498 6 1FSTNR HH648 6 Aluminum 10192 Silver PC 10193 10195 2 See Enlarged View on the following page for the part numbers of the fasteners 1NUT LC514 1FSTNR HH742 10196 2 10198 2 Aluminum 111399 Silver PC 111400 111402 See Enlarged View on following page for part numbers of fasteners 10197 111537 1FSTNR HH825 1WASHR LC830 ...

Страница 50: ...eners for the Motor Mount Plate Bearing and Positive Stop assemblies are the same for both the driver and passenger side assemblies 1WASHR LC581 1WASHR FL747 1FSTNR HH734 10200 10202 1FSTNR HH324 4 1WASHR FL498 4 1WASHR LC291 4 1WASHR FL498 4 1WASHR FL872 4 1NUT RG469 8 See Enlarged View above for part numbers 10195 1FSTNR HH493 4 1WASHR LC498 4 1FSTNR HH288 4 1WASHR LC291 4 1WASHR FL872 4 PS Moto...

Страница 51: ...10 Fax 248 380 9681 47 Maintenance Exploded Parts View H2AIR Dryer Assembly Push Bar to Nozzle Mount Plate 1WASHR LC498 2 per side 1FSTNR HH558 2 per side 1WASHR FL706 2 per side Push Bar 111402 Nozzle Mount Plate Top Flip Bracket Weldment made transparent to see fasteners more clearly ...

Страница 52: ...nc PO BOX 5470 Northville MI 48167 5470 Ph 248 349 7010 Fax 248 380 9681 1MANUL958 Maintenance Exploded Parts View H2AIR Dryer Assembly Mount Bracket Cover Logo Assembly 1DECAL FD001 1PLSTC CV228 1WASHR FL332 4 1FSTNR BH420 4 ...

Страница 53: ...14 380V 111412 575V Passenger Side Assembly 111408 208V 111415 380V 111413 575V 10206 208V 1MOTOR EL833 380V 1MOTOR EL843 575V 1MOTOR EL917 Impeller CW 208V 575V 1IMPLR750 380V 1IMPLR516 1WASHR LC498 4 1FSTNR HH504 4 Driver Side Motor Impeller Assembly Passenger Side Motor Impeller Assembly 208V 1MOTOR EL834 380V 1MOTOR EL844 575V 1MOTOR EL918 10206 Impeller CCW 208V 575V 1IMPLR775 380V 1IMPLR532 ...

Страница 54: ...Bolts 1WASHR FL498 8 Air Cannon Nozzle Housing Assembly CW 111281 CCW 111282 111285 1WASHR FL498 8 1FSTNR HH054 4 1WASHR FL332 4 1FSTNR FH185 4 1FSTNR BH420 111274 10130 1CLAMP380 4 1WASHR LC291 8 1WASHR FL872 8 1FSTNR HH306 8 1GASKT750 1NOZZL PL650 1IMPLR275 1IMPLR CO420 1FSTNR FH825 8 1NUT LC215 8 1GASKT750 1RETNR650 8 shown in chart below 111275 8920 4 shown in chart below 1FSTNR HH270 8 1NUT L...

Страница 55: ...1391 Airis CW Assembly 111385 See exploded view on following page Airis CCW Assembly 111388 See exploded view on following page Assembled Airis Air Panel 111389 See exploded view on following page 1NUT LC215 8 1UNION PL690 2 Airis Mounting Stud 111382 8 Shown installed above 1WASHR LC291 8 Shown installed above 1NUT LC215 8 Shown installed above right 1WASHR LC291 8 111382 8 ...

Страница 56: ...8 349 7010 Fax 248 380 9681 1MANUL958 Maintenance Exploded Parts View Airis Clock Wise Assembly 111385 1FSTNR HH449 1WASHR LC415 111383 1RETNR910 4 1WASHR FL749 4 1WASHR PL508 8 10175 4 10184 4 111383 1GASKT760 111384 1WASHR PL160 1FSTNR SB152 Cylinder Asy 111381 111381 ...

Страница 57: ...7010 Fax 248 380 9681 53 Maintenance Exploded Parts View Airis Counter Clockwise Assembly 111388 1WASHR PL160 1FSTNR SB152 Cylinder Asy 111381 1FSTNR HH449 1WASHR LC415 111386 1RETNR910 4 1WASHR FL749 4 1WASHR PL508 8 10175 4 Cylinder Asy 111381 1GASKT760 111387 10184 4 111386 111381 ...

Страница 58: ... for Airis Assembly 111389 1VALVE EL710 1MADAP BR600 TO MAIN AIR CONNECTION 1GAUGE500 2 1RGLTR175 2 1ELBOW PL666 TO RETRACT CYLINDER 3699 1AIRLN220 1AIRLN550 2529 2 1FSTNR SH177 4 1WASHR LC115 4 1ELBOW PL666 TO EXTEND CYLINDER 1MADAP BR600 2 1ELBOW PL666 2 1FSTNR HH081 2 1WASHR LC125 2 120 VAC 10186 1ELBOW PL535 2 1FSTNR HH081 2 1MADAP BR600 1VALVE EL710 1FSTNR BH370 2 10185 1WASHR LC125 2 ...

Страница 59: ...Overview Top Manifold Cover 111524 CW Air Cannon DryLite Nozzle Asy 111281 H2AIR Dryer Asy 111539 CCW Air Cannon DryLite Nozzle Asy 111282 Water Manifold Asy 111533 Top Manifold Asy 111528 Top Manifold LED Asy 111179 View from Exit View from Entrance LED Box for Side Legs 111531 LED Box for Top Manifold DryLite Nozzles 111530 Airis Air Cannon Dual Kit 111391 ...

Страница 60: ...8 349 7010 Fax 248 380 9681 1MANUL958 Maintenance Exploded Parts View Water Manifold Assembly 111533 1WASHR FL498 2 1FSTNR HH350 2 1WASHR LC291 2 1NUT RG469 2 1FTTNG BH318 6 1ELBOW BR580 4 1TEE BR936 2 1NIPPL BR930 2 1ELBOW BR585 4 1FTTNG BH400 2 Completed Assembly 10266 ...

Страница 61: ...fold Assembly 111528 Complete Assembly 111528 1WRAP250 1 OD Black Poly Spiral Wrap Length 4 FT 1HOSE550 2 1 2 200 PSI Blue Hose Length 5 FT 111503 2 111529 4 1NUT AN462 4 1NOZZL993 8 1NOZZL972 8 1NOZZL FJ348 8 1FSTNR HH342 4 1WASHR FL498 8 1NUT LC214 4 See Enlarged View above right for part numbers See Enlarged View on Following Page 111498 111498 ...

Страница 62: ... Manifold Manifold Mount Hose Connectors Top Manifold LED RGB Assembly Overview 1ELBOW SS017 2 1FTTNG BH302 2 1CLAMP467 2 one per each end of hose 1HOSE550 2 1 2 200 PSI Blue Hose Length 5 FT 1FSTNR HH261 4 1WASHR LC291 4 1CLAMP467 2 one per each end of hose Top Manifold LED RGB Asy 111179 2 Part of H2AIR LED RGB Kit 111532 see following page ...

Страница 63: ...AirCannon LED Cables 1LED024 21 Sections UL 24V LED RGB 5M 1 per Top Manifold 1ELECT CB844 2 CABLE 4 C 20GA 300V UL GRAY LENGTH 10 FT Important Note The LED RGB Kit Assembly 111532 for the H2AIR contains four 4 LED RGB Assemblies part number 111179 one for each Leg Assembly and two for the Top Assembly 111179 2 Two 2 per Leg 1ELECT FS176 2 1FSTNR BH420 2 111530 1ELECT CB844 2 CABLE 4 C 20GA 300V U...

Страница 64: ...AIR ARCH 60 Belanger Inc PO BOX 5470 Northville MI 48167 5470 Ph 248 349 7010 Fax 248 380 9681 1MANUL958 Maintenance Exploded Parts View Top Manifold Cover Kit 111524 Assembled 1PLSTC CV250 4 1GRMIT850 8 ...

Страница 65: ...intenance Exploded Parts View Leg Assembly Overview Leg Manifold Mounting See the Exploded View on the following page Leg Assemblies with Water Manifold Driver Side Siver PC 111509 Aluminum 111508 Passenger Side Silver PC 111512 Aluminum 111511 Leg LED RGB Mounting See the Exploded View on the following pages ...

Страница 66: ...e Leg Weldment Silver PC 111442 Aluminum 111495 Passenger Side Leg Weldment Silver PC 111500 Aluminum 111501 1FTTNG BH269 2 1FSTNR BH158 2 1CLAMP488 2 10220 1FTTNG BH420 3 1WASHR FL332 3 1FSTNR ST750 4 per Leg 1PLUG PL654 2 10220 1CLAMP488 2 1FSTNR BH158 2 Lens Mount Asy 2 See Enlarged View on the Following Page Manifold Asy See Enlarged View on the Following Page The driver side Leg Assembly is s...

Страница 67: ...8 2 10262 1CLAMP467 1FTTNG BH269 1PLUG PL654 1CLAMP467 2 1FTTNG BH269 2 1PLUG PL654 2 1HOSE550 2 1 2 200 PSI 9 FT Each 1FSTNR HK275 1FSTNR BH158 2 1CLAMP488 2 10256 1WASHR LC270 1WASHR FL415 Lens Mount Asy Two 2 per Leg Assembly Nozzle Asy Eight 8 per Leg Assembly 1NOZZL972 1NOZZL FJ348 1NOZZL993 The driver side Leg Assembly is shown Part numbers are the same for the the passenger side Leg Assembl...

Страница 68: ...1179 1LED024 21 Sections UL 24V LED RGB 5M 1 Pair on Each Leg See Note Above 111179 1ELECT CB844 CABLE 4 C 20GA 300V UL GRAY LENGTH 10 FT 10258 2 on Each Leg Important Note The LED RGB Kit Assembly 111532 for the H2AIR contains four 4 LED RGB Assemblies part number 111179 one for each Leg Assembly and two for the Top Assembly 111531 Mounted on the driver side of the top flip weldment 1FSTNR BH420 ...

Страница 69: ...111517 1FSTNR HK275 1WASHR FL415 1WASHR LC270 1GRMIT850 16 Total 8 Per Cover Driver Side Passenger Side Cover 1PLSTC CV238 2 Leg Assembly Weldment Ref Cover Mount Asy part of Leg Asy Two 2 per Leg Assembly Manifold Cover Kit 111517 Important Note An H2AIR Arch has 24V RGB lights in each of the Leg Assemblies the Leg Assembly Covers are ONLY available in the natural color ...

Страница 70: ......

Страница 71: ......

Страница 72: ...H2AIR ARCH 1MANUL958 Belanger Inc P O Box 5470 Northville MI 48167 5470 Customer Service Phone 248 349 7010 Fax 248 380 9681 ...