QWIK-PURE 25, 50
16
To ensure trouble-free operation, ob-
serve all the points listed under
Main-
tenance
:
The constituents of the compressor
condensate will depend on the specific
application.
It is part of the operator’s duty of care to
take the necessary precautions, where
appropriate.
Fill QWIK-PURE with clean water
• Take off the cap, remove filter mat from
the pressure relief chamber
• Let in the water through the inlet open-
ing: container and filter chamber are
filling up.
• Shut off the water when it starts to come
out at the water outlet.
The water level will sink due to the
gradual water intake of the filter.
• Fill up with clean water as required.
• Install again filter mat and presuure
relief chamber
The QWIK-PURE is ready for operation:
• Compressor condensate can now flow
into the QWIK-PURE via the pressure
relief chamber.
Note:
Open the outlet of the condensate
drain!
Check all connections for leaks!
english
Putting into operation • Puesta en marcha
Mise en service • Colocação em funcionamento
english
Operation • Servicio
Utilisation • Operação
water
agua
eau
água
deutsch
Installation • Installation
Installation • Installatie
4. QWIK-PURE 50 with heating
(op-
tional)
• Please follow the instructions for
installation and operation of heating
Systems.
• The electrical installation must only be
carried out by suitably qualified and
authorised personnel !
- If the temperature of the medium drops
below approx. 41 °F, the heating will be
switched on automatically.
- When the setpoint temperature of 59
°F is attained, the heating will again be
switched off automatically.
- built-in overheating protection limits the
temperature of the heating system to a
maximum of 167 °F.