![BEKA Stream E 2520 Series Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/beka/stream-e-2520-series/stream-e-2520-series_original-operating-and-assembly-manual_2723985017.webp)
Page
17 ©
BEKA 2017 All rights reserved!
...a product of
10.3 Adjustment of visual level monitoring (barrel version)
1. Step:
Evaluate height of barrel (dimension B)
2. Step:
Set the visual sensor to dimension B – 7 cm (empty message). If also a prewarning
is necessary, another switching point of the visual sensor at an optional height before
the empty signal, shall be adjusted.
Observe the separate technical documentation of the level
sensor enclosed.
10.4 Initial filling of container with lubricant
Open the ventilation screw on the reservoir back (hexagon
socket AF 10) for the initial filling.
Remove the screw plug from the filling connection G1 (1)
(hexagon socket AF 17).
Fill up lubricant via the filling connection G1 (1) until lubricant
comes out of the ventilation screw!
Tighten the ventilation screw again.
Other procedures are described in 8.2, lubricant filling.
Fill up the reservoir via the filling connection G1 (1) until
lubricant comes out of the overfill protection (2)!
Attention!
B
2
3
1