-28-
09 - Assembly and start-up
Assembly and start-up of the BEKAONE120 may be done only by qualified technical personnel
with the necessary knowledge.
Take all necessary measures for assembling a complete machine from the BEKAONE120
and other components in a proper and eco-friendly way, without impairment of persons‘
health and safety.
Please remember to adjust and ventilate the
BEKAONE120
prior to assembling it.
Prior to assembly, prefill the lubrication point and lubrication lines or extensions with the
appropriate lubricant. You can use e.g. the hand-lever grease gun for that.
4. Screw in the
BEKAONE120
hand-tight,
use an adapter, if necessary
3. Prefill the lubrication point and possibly
lubrication lines with lubricant
1. Clean the lubrication
point
2. Remove the old
fitting
5. Tighten the connection thread
at the hexagonal bolt
EN
Содержание ONE 120
Страница 3: ...Montageanleitung und Hinweise zum Betrieb DE ...
Страница 17: ... 16 Assembly and operating instructions EN ...
Страница 31: ... 30 Manual de montaje e instrucciones de uso ES ...
Страница 45: ... 44 Manual de montagem e instruções de uso PT ...
Страница 59: ... 58 安装与操作说明 漢語 ...
Страница 73: ...Declaration of conformity and incorporation 72 ...
Страница 74: ... 73 Declaration of conformity and incorporation ...
Страница 75: ...Declaration of conformity and incorporation 74 ...
Страница 76: ......