Software
Transfer Image
1. Double-click on the executable Image Loader file to start the transfer program.
2. Follow the instructions.
The image transfer procedure is completely menu-driven. The operator panel
will be ready for transfer directly afterwards, provided that all steps are performed
and completed.
The following steps outline the transfer procedure:
1. Disconnect the power supply from the panel.
2. Set the mode switches in mode 0100 (Image Load mode).
3. Reconnect the power supply.
4. Select the operator panel to upgrade by entering its IP address.
5. Click
Upgrade
.
6. When the upgrade is finished, disconnect power from the operator panel.
7. Set the mode switches in mode 0000 (Run mode).
8. Reconnect power to the operator panel.
Note:
When updating an operator panel, it is important to ensure that power is not
interrupted during the transfer.
Related information
Beijer Electronics, MAEN003
43