background image

 

 

Operating Instructions 

HBP530A-CNC 

 

BA85308 

Status 46/04 

 

Rev 07.02.11 

Page 10 

2  Installation 

2.1  Transport 

The machine can be suspended for transporting by boreholes at the machine column. By 
the  transport  with  the  fork  truck  it  is  to  look  for  a  continues  weight  distribution  on  both 
forks. The centre of gravity of the machine is in the region of the saw bow. 
 

2.2  Foundation 

For a professional assembly the foundation is to be build after the supplemented drawing.  
The plainness of the floor should have +0 / -10 mm. An adequate concrete quality is B25. 
If necessary the customer has to arrange a static calculation.  
The machine must be fixed at the floor with foundation bolts this particularly if is in relation 
with roller conveyors and measuring device. 
That  the  coolant  does  not  flows  to  far  backward  on  the  long  work  piece  surfaces,  an 
assembly with a slight incline to the cutting side is recommended. 
 

2.3  Electrical connections 

 

Attention! 
Never  do  any  work  at  the  electrical  parts  before  the  electricity  is 
disconnected. 
Make sure that not unauthorised electricity will be switched on. 

 
Before connecting it is to proof, if the operating voltage of the net is identical with the 
voltage of the driving motor. 
 
The sawing machine is installed. It is only to feed the power supply cable into the switch 
gear cabinet and the cable is to connect at the binding screws L1, L2, L3 and PEN. At 
these binding screws it has to be a right hand rotary field. The right turning direction can 
be seen by switch on of the hydraulic. If the manometer shows pressure for the plant after 
switch on, the rotary direction is correct. 
 
The change of the turning direction is only to attain by changing the two outward ladder of 
the connection cable. 
 
After connecting the machine the control voltage is to proof. If the control voltage is higher 
than 26 V or less than 22 V the control transformer from the lead side, is to regulate for the 
higher or lesser voltage. 
 

 

Attention! 
After an operation time from 1 week, the binding screws of the switchgear 
and  the  binding  screws  in  the  switchgear  cabinets  have  to  be  strongly 
tightened. 

When  a  customer  uses  a  Residual  Current  Circuit-Breaker,  he  must  use  a  so-called  "All 
Current  Sensitive  Residual  Current  Circuit-Breaker  300mA".  A  300mA  Residual  Current 
Circuit  Breaker  offers  protection  with  indirect  contact  and  also  fire  protection  which  is 
customary and satisfactory with industrial facilities. 
 

Содержание HBP530A-CNC

Страница 1: ...and choice 11 4 Operation 12 4 1 Description control panel 12 4 2 Switch on and off 12 4 3 Saw frame 13 4 4 Clamping device 13 4 4 1 Material collet 13 4 4 2 Supply gripper 13 4 4 3 Clamping pressure...

Страница 2: ...0 5 3 3 Record data 32 5 3 4 Job list page 49 34 5 3 5 Job list 35 5 3 6 End piece stop page 51 36 5 4 Cutting menu page 5 37 5 4 1 Cutting data page 6 38 5 4 2 Cutting data 39 5 4 3 Time record page...

Страница 3: ...mp page 30 82 5 7 3 4 2 Feed gripper page 31 83 5 7 3 4 3 Vertical clamp page 32 84 5 7 3 4 4 Portal clamp page 33 85 5 7 3 5 Paraphernalia page 29 86 5 7 3 6 Material Transport page 55 87 5 7 3 6 1 I...

Страница 4: ...uides 120 10 7 Wheel cases 120 10 8 Chip conveyor Specific equipment 120 10 9 Measuring unit Specific equipment 120 10 10 Change of battery 120 10 10 1 Operation steps 121 10 11 Preplacement and Clean...

Страница 5: ...l filter cleaning 131 14 7 4 Oil container strainer cleaning 131 14 7 5 Sprayoil lead micropump bleeding 131 14 8 Disturbance 131 15 Central Lubrication System Special Equipment 132 15 1 Structure and...

Страница 6: ...er operation of this equipment can render it a danger to life and limb for the operator and other persons 1 2 Explanation of Symbols The following symbols are used in the Operating Instructions Danger...

Страница 7: ...risks and hazards as well as the safety equipment incorporated in this machinery Safety equipment such as emergency stops and covers must not be removed or rendered inoperative In front and behind of...

Страница 8: ...cleaning maintenance work and repairing switch off the main switch and support the saw frame Never grip during the sawing process in the sawing or clamping zone Attention the machine lags The operator...

Страница 9: ...machine in idle running When the saw band enters the cut noise levels can increase depending on the grade and shape of the material being sawn On solid material 80 85 dB A is rarely exceeded Particula...

Страница 10: ...t is to proof if the operating voltage of the net is identical with the voltage of the driving motor The sawing machine is installed It is only to feed the power supply cable into the switch gear cabi...

Страница 11: ...ake sure that the concentrate is filled in the water and not vice versa The mixing should be done by strong stirring If there is a danger of freezing it is additional to fill in anti freezer mixture r...

Страница 12: ...icator shows a interruption of the machine by a red flashing Point light With this switch is the point light switched on respectively off Mode pre selection With this switch is pre selected between au...

Страница 13: ...al for clamping two hand operation is to do by pressing the corresponding function key NG open NG clamping 4 4 3 Clamping pressure For thin walled profiles it is possible to reduce the clamping pressu...

Страница 14: ...material Adjustment 1 3 For standard steel as e g C 15 C 45 Adjustment 4 6 For high strength steel Adjustment 7 9 For running in of new sawbands the feed is to reduce for the first cuts approximately...

Страница 15: ...toxic and are to use only in closed systems 4 9 Sawband change Attention The sawing machine lags After switch off waiting until the machine stands still Never grip in the running tool The machine oper...

Страница 16: ...chapter Cutting pressure adjustment and feed adjustment 4 10 Supply Carriage By pressing the switch NG forward NG backward 2 hand operation the supply carriage is to move For this the sawband is to li...

Страница 17: ...serstrahlung BGV B2 VBG 93 ist einzuhalten Avoid a direct look into the laser light 4 16 Material shaking conveyor specific equipment The material shaking conveyor works parallel with the saw drive if...

Страница 18: ...ation is to machine with the data who are programmed in the set then at first it is to jump in the menu job input page 4 and to enter the correct data If the automatic is started with saw off then the...

Страница 19: ...ing manual operation Manual cope Adjusting the coping height with a ruler at the saw frame Electronical cope Entering the coping height at the operation panel at page 27 common sawing coping at mm If...

Страница 20: ...sawing process to be programmed Additionally faults are displayed on screen with descriptions to inform the operator of the machine status Fault messages are shown independent of the present procedure...

Отзывы: