![Beckman Coulter TQ-Prep Скачать руководство пользователя страница 78](http://html.mh-extra.com/html/beckman-coulter/tq-prep/tq-prep_reference_2719765078.webp)
PN 4237395AA
-1
INDEX
Symbols
µL
definition, GLOSSARY-2
A
A
definition, GLOSSARY-1
accessibility, instrument
installation requirements, 2-1
accuracy
definition, GLOSSARY-1
performance specifications, 4-3
specifications, 4-3
action log sheet, A-7
adjustment procedures
touch screen contrast, 2-18
AG
definition, GLOSSARY-1
air-displacement pipet
calibration, B-2
definition, GLOSSARY-1
alignment
checking carousel, 2-19
ambient temperature
definition, GLOSSARY-1
instrument, 2-1, 4-1
anticoagulant recommended, 4-2
B
buttons
convention used, x
definition, GLOSSARY-1
C
cable connections
at installation, 2-17
calibration
of air-displacement pipet, B-2
of positive-displacement pipet, B-6
specification, 4-3
carousel
checking alignment, 2-19
description, 1-2
home position, definition, GLOSSARY-1
home position, description, 3-1
home position, figure, 3-1
tube loading position, definition,
GLOSSARY-2
tube loading position, description, 3-2
tube loading position, figure, 3-1
CD4
definition, GLOSSARY-1
centrifugation
definition, GLOSSARY-1
characteristics, performance, 4-3
checking
alignment, at installation, 2-19
cm
definition, GLOSSARY-1
coefficient of variation (CV)
definition, GLOSSARY-1
components, system
description, 1-2
dimensions, 4-1
location, 1-2
reagent storage and dispense area, 1-3
sample processing area, 1-2
connections, tubing
WASTE container, 2-14
connectors, level sense
location, 2-12
conventions used, x
COULTER CLONE monoclonal antibody
used with sample, 4-2
cover
reagent, location on system, 2-16
CV
definition, GLOSSARY-1
CYTO-STAT monoclonal antibody
used with sample, 4-2
D
Data Sheets, Material Safety
ordering, 1-5
dc
definition, GLOSSARY-1
definitions, GLOSSARY-1
deionized water
definition, GLOSSARY-1
for use as OPTION reagent, 1-5
delivery inspection, instrument
if installed by Coulter representative, 2-2
if installed by customer, 2-2
delivery volume, 4-3
Содержание TQ-Prep
Страница 4: ...PN 4237395AA iv REVISION STATUS ...
Страница 8: ...PN 4237395AA viii CONTENTS ...
Страница 17: ...PN 4237395AA 1 6 USE AND FUNCTION MATERIAL SAFETY DATA SHEETS MSDS ...
Страница 43: ...PN 4237395AA 3 4 OPERATION PRINCIPLES TYPES OF PRIMING ...
Страница 47: ...PN 4237395AA 4 4 SPECIFICATIONS CHARACTERISTICS PERFORMANCE CHARACTERISTICS ...
Страница 49: ...PN 4237395AA A 2 LOG SHEETS ...
Страница 51: ...PN 4237395AA A 4 LOG SHEETS ...
Страница 53: ...PN 4237395AA A 6 LOG SHEETS ...
Страница 55: ...PN 4237395AA A 8 LOG SHEETS ...
Страница 69: ...PN 4237395AA B 14 OPERATOR CERTIFICATION PROCEDURE TQ PREP WORKSTATION PRECISION PROCEDURE ...
Страница 71: ...PN 4237395AA B 16 OPERATOR CERTIFICATION PROCEDURE TQ PREP WORKSTATION PRECISION PROCEDURE ...
Страница 73: ...PN 4237395AA 2 REFERENCES ...
Страница 77: ...PN 4237395AA 4 GLOSSARY ...
Страница 85: ......