![Beckman Coulter TQ-Prep Скачать руководство пользователя страница 59](http://html.mh-extra.com/html/beckman-coulter/tq-prep/tq-prep_reference_2719765059.webp)
PN 4237395AA
B-4
OPERATOR CERTIFICATION PROCEDURE
PIPET CALIBRATION PROCEDURE
7
Slowly release the plunger to overdraw
the required volume.
8
Remove the tip from the deionized or
distilled water while touching the tip to
an inside wall to remove any adhering
liquid.
9
While touching the tip to the tared
weigh boat, slowly dispense the water
by depressing the plunger to the first
stop only. There must be liquid
remaining inside the tip.
Содержание TQ-Prep
Страница 4: ...PN 4237395AA iv REVISION STATUS ...
Страница 8: ...PN 4237395AA viii CONTENTS ...
Страница 17: ...PN 4237395AA 1 6 USE AND FUNCTION MATERIAL SAFETY DATA SHEETS MSDS ...
Страница 43: ...PN 4237395AA 3 4 OPERATION PRINCIPLES TYPES OF PRIMING ...
Страница 47: ...PN 4237395AA 4 4 SPECIFICATIONS CHARACTERISTICS PERFORMANCE CHARACTERISTICS ...
Страница 49: ...PN 4237395AA A 2 LOG SHEETS ...
Страница 51: ...PN 4237395AA A 4 LOG SHEETS ...
Страница 53: ...PN 4237395AA A 6 LOG SHEETS ...
Страница 55: ...PN 4237395AA A 8 LOG SHEETS ...
Страница 69: ...PN 4237395AA B 14 OPERATOR CERTIFICATION PROCEDURE TQ PREP WORKSTATION PRECISION PROCEDURE ...
Страница 71: ...PN 4237395AA B 16 OPERATOR CERTIFICATION PROCEDURE TQ PREP WORKSTATION PRECISION PROCEDURE ...
Страница 73: ...PN 4237395AA 2 REFERENCES ...
Страница 77: ...PN 4237395AA 4 GLOSSARY ...
Страница 85: ......